Engineering Submittals

Regarding issued Document transmittal ref no: xxx DT. xxx

Date:               xxx

Ref:                  xxx

Kind Attn         :Mr. xxx

Project             :2B + G + 14 + Lower Roof Hotel Building on Plot No. xxx at Al Barsha

1st, Dubai U.A.E.

Subject            : Regarding issued Document transmittal ref no:AP/269/CC/42 DT. 13.02.17

Dear Sir,

With reference to the above , as per your document transmittal ,we have been analyzed the document and kindly being intimated the following:

  1. As per this submission, the BOH lightings are same as per approved drawing for BOH area.
  • The drawing attached for the health club area is not matching with the latest change and this drawing is same as per previous approval and we have already communicated that we need IFC drawing for health club area.
  • The requirement of BOH light , we are comparing  and will be submitted by 05.03.17 .

This is for your kind information.

Regards,

For xxx Contracting L.L.C.

xxx

Project Manager