REVISED LPO Terms and Conditions

xxx Ref. No. CC/2017/11.06.2017 To: xxx FZCO Dubai, UAE Project               : 2B+G+14 Lower Roof Hotels Building Plot No.              : 373-1297 Location            : Al Barsha, Dubai Subject               : REVISED LPO Terms and Conditions Dear Sir, With reference to the above mentioned project/subject with ref. no. AP/269//301 dated 28.05.2017, the following Terms and Conditions to be consider […]

REVISED LPO Terms and Conditions Read Post »

Statement

To provide original volume (01) one revised in meeting with consultant site office with client.

Date: xxx Ref: CC/ NAFCO/006/18 To                     : M/s. xxx FZCO. Project            : 2B + G + 14 + Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Atten              : Mr. xxx Chandwani Subject          : To provide original volume (01) one revised in meeting with consultant site office with client. Dear Mr. Jithen, I

To provide original volume (01) one revised in meeting with consultant site office with client. Read Post »

Statement

Regarding waiting contract document volume 1 return back as informed to review your comments terms and conditions (continuous reminder).

Date: xxx Ref: CC/ NAFCO/005/18 To                     : M/s. xxx FZCO. Project            : 2B + G + 14 + Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Atten              : Mr. xxx Chandwani Subject          : Regarding waiting contract document volume 1 return back as informed to review your comments terms and conditions (continuous reminder).

Regarding waiting contract document volume 1 return back as informed to review your comments terms and conditions (continuous reminder). Read Post »

Delay in the certification of our invoice

Regarding submission of the contract copy and shop drawing.

Date: xxx Ref: CC/ NAFCO/004 To                     : M/s. xxx FZCO. Project            : 2B + G + 14 + Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Atten              : Mr. xxx Chandwani Subject          : Regarding submission of the contract copy and shop drawing. Dear Sir, With reference to above we would like to

Regarding submission of the contract copy and shop drawing. Read Post »

Delay in the certification of our invoice

Signing of Agreement awaited and submit a signed document copy

Date: xxx Ref: CC/ NAFCO/003 To                     : M/s. xxx FZCO. Project            : 2B + G + 14 + Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Subject          : Signing of Agreement awaited and submit a signed document copy Dear Sir, With reference above mentioned subject, the contract documents has been collected from

Signing of Agreement awaited and submit a signed document copy Read Post »

Undertaking Letter

Regarding your agreement issue and submission of shop drawing.

Date: xxx Ref: CC/ NAFCO/001 To                     : M/s. xxx FZCO. Project            : 2B + G + 14 + Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Subject          : Regarding your agreement issue and submission of shop drawing. Dear Sir, With reference above, we would like to inform you kindly inform us formally

Regarding your agreement issue and submission of shop drawing. Read Post »

Change Contractor

CONTRACT AGREEMENT – EDITED

CONTRACT AGREEMENT – EDITED CC /NAFCO/002/17                                                                                                                             Date: xxx This Agreement is made Between M/s. xxx Contracting LLC (here after called first party), P.O. Box No. 31537 Dubai, UAE. (Herein after referred to as “the Main Contractor”) Ad M/s. xxx Electromechanical Co. LLC (here after called second party), (Herein after referred to as “the Sub-contractor for

CONTRACT AGREEMENT – EDITED Read Post »

Transformer

Undertaking letter for HV Cable Tray

Date: xxx Ref: CC/ARK/DEWA/NA/2018-28 To,       The Manager, HV Design Department Dubai Electricity & Water Authority, Dubai-UAE Project             : 2B+G+M+13 Lower Roof Hotel Building ( Citymax ) Plot No            : Plot # 373-1297 Client              : xxx Consultants    : M/s xxx Consultants Subject            : Undertaking letter for HV Cable Tray Dear Sir, With reference to above

Undertaking letter for HV Cable Tray Read Post »

GSM

Regarding GSM drawing for coordination and GSM related work to be execute prior to closing the ceiling.

Ref  :  xxx  Date:   09/01/2018 To,        The Manager        Etisalat Attn : Mr. Muhamed ( 0561933216) Subject :  Regarding GSM drawing for coordination and GSM related work to be execute prior to closing the ceiling. Dear Sir,              With reference to above and the information provided by our client ( Mr. John Cherian) that

Regarding GSM drawing for coordination and GSM related work to be execute prior to closing the ceiling. Read Post »

Transformer

Application no –E964644 for substation inspection and our under taking letter for Tower carne as well as logistic support to shift the transformer.

Date: xxx Ref no: CC/DEWA/004/17  To,  Senior Manager  Design Approval  Dewa,Dubai Project            : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Client              : Al Sheikh Faisal Bin Khalid Sultan Al Qassemi.  Subject           : Application no –E964644 for substation inspection and our under taking letter for Tower carne

Application no –E964644 for substation inspection and our under taking letter for Tower carne as well as logistic support to shift the transformer. Read Post »