Concreting-of-reinforced-concrete-slab-photo-by-the-author-of-the-paper

Undertaking for law height form work for slab above ettic slab (0.7m height) and pool deck.

Date: xxx Ref no: CC/DT/DM/13 To, Dubai Municipality Building Control section Dubai, UAE Project      : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Sub               : Undertaking for law height form work for slab above ettic slab (0.7m   height) and pool deck. Dear Sir, With reference to the […]

Undertaking for law height form work for slab above ettic slab (0.7m height) and pool deck. Read Post »

PT WORKS

Submission of the proposal to close the distribution pump opening in PT slab from 4th floor to roof located in corridor

Date: xxx Ref no: CC/DT/DM/12 To, Dubai Municipality Building Control section Dubai, UAE Project        : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Sub                : Submission of the proposal to close the distribution pump opening in PT slab from 4th floor to roof located in corridor Dear

Submission of the proposal to close the distribution pump opening in PT slab from 4th floor to roof located in corridor Read Post »

Beam Jacketing

Undertaking letter by Main contractor for structural safety /building safety as required in application no: xxx.

Date: xxx Ref no: CC/DT/DM/09 To, Dubai Municipality Building permit section Dubai, UAE Project       :    2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-xxx at Barsha, Dubai Sub      :  Undertaking letter by Main contractor for structural safety /building    safety as  required in application no:241570-23-1. Dear Sir, With reference to the

Undertaking letter by Main contractor for structural safety /building safety as required in application no: xxx. Read Post »

Engineer's Training

Engineers are ready for training required for xxx Contracting L.L.C License no: xxx

Date: xxx Ref no: CC/DT/DM/06/16-1 To The Manager, DM Qualification Section (License) xxx Municipality, Dubai UAE Sub:  Engineers are ready for training required for xxx Contracting L.L.C License no: xxx Dear Sir, With ref. to above and requirement our engineers are ready to take the training immediately with your appointment. So, kindly provide immediate appointment

Engineers are ready for training required for xxx Contracting L.L.C License no: xxx Read Post »

fixing doors

Balance work at 14 th floor and three nos of door not fixed as well as still Architrave not fixed up to now and pool quality work

Date : xxx Ref No. : CC/DESTEC/023 To : M/s. xxx GROUP, PO Box 47395, Sharjah UAE Project : 2B+G+14+Lower Roof Hotels Building on Plot No. 373-1297 at Al Barsha  Subject : Balance work at 14 th floor and three nos of door not fixed as well as  still Architrave not fixed up to now

Balance work at 14 th floor and three nos of door not fixed as well as still Architrave not fixed up to now and pool quality work Read Post »

Claim rejected

Rejection of your claim by main contractor your letter Ref DEC/CM/AP/CC/11 dated xxx and revert back

Date            : xxx                    Ref               : CC/DESTEC/019 To                 : M/s. xxx GROUP, PO Box 47395, Sharjah UAE. Project          : 2B + G + 14 + Lower Roof Hotels Building on Plot No. 373-1297 at Al Barsha, Dubai. Subject        : Rejection of your claim by main contractor your letter Ref DEC/CM/AP/CC/11 dated 11/01/2017 and revert back

Rejection of your claim by main contractor your letter Ref DEC/CM/AP/CC/11 dated xxx and revert back Read Post »