Bituminous-Membrane-Waterproofing

Rejection of waterproofing works.

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject         :  Rejection of waterproofing works. Dear Ms . Alma, This is to inform you that, I am rejecting the water proofing which is started 14 th floor […]

Rejection of waterproofing works. Read Post »

Building Footing

METHOD STATEMENT FOR SHIFTING OF FOOTINGS

Project Name    : Proposed Development of Residential Villa (G+2) On Plot No. xxx Location             : Palm Jumeirah, Dubai, United Arab Emirates Client                   : Mr. xxx Consultant         : Al xxx Consultants Contractor         : M/S xxx Building Contracting LLC METHOD STATEMENT FOR SHIFTING OF FOOTINGS            Table of Contents                1. Purpose                2. Tools Plant and

METHOD STATEMENT FOR SHIFTING OF FOOTINGS Read Post »

Chiller

Lifting of the chiller and submission of the required document for the operation

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject         :  Regarding lifting of the chiller and submission of the required document                          for the operation. Dear Sir, With reference to the above subject we are hereby

Lifting of the chiller and submission of the required document for the operation Read Post »

Engineering Submittals

Submission of the GSM report issued by Etisalat.

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject         :  Submission of the GSM report issued by etisalat. Dear Sir,       With reference to above we would like to inform you that, after a long follow

Submission of the GSM report issued by Etisalat. Read Post »

UPS

Nomination of the UPS supplier and finalization of the UPS room

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject      : Regarding nomination of the UPS supplier and finalization of the UPS room for coordination with low voltage sub contractors. Dear Sir, With reference to above we

Nomination of the UPS supplier and finalization of the UPS room Read Post »

internal Signage

Nomination for Internal Signage not yet provided

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject        : Nomination for Internal Signage not yet provided Dear Sir, We received the signage drawing with Transmittal Ref. no. AP/269/CC/61 dated xxx and PS item on Bill

Nomination for Internal Signage not yet provided Read Post »

Lift contract draft

Cable inside the lift and WIFI and camera cable and connection

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject      : Regarding issue raised by xxx Emirates in minutes of meeting item no 5.9,C  for cable inside the lift and  inter connection in the lift( WIFI and

Cable inside the lift and WIFI and camera cable and connection Read Post »

Façade lighting

Supply and installation of Façade lighting

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject      : Supply and installation of Façade lighting with nomination ref no:xxx                          on dated xxx.   SL NO   ITEM DESCRIPTION IN                 NOMINATION CONTRACT BOQ ITEM REF

Supply and installation of Façade lighting Read Post »

CCTV Camera

CCTV documents provided by sub contractor

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject      : Regarding CCTV documents provided by sub contractor and our follow up status. Dear Sir, With reference to above, we are following with the xxx and they

CCTV documents provided by sub contractor Read Post »

foam concrete

Disapproval of Roof Waterproofing NCR 062 – Foam Concrete

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject        : Regarding Roof Waterproofing NCR 062 – Foam Concrete on Upper and Lower Roof Disapproval Dear Sir, With reference to the above mentioned subject, we would like

Disapproval of Roof Waterproofing NCR 062 – Foam Concrete Read Post »