CHECK LIST FOR: INSTALLATION OF COLD WATER PIPING SYSTEM Under Ground. Form No: Rev. No : 0 Page : 1 of 1 SUBCONTRACTOR X CONTRACTOR SECTION OF WORK: Water Supply LOCATION: LEVEL: WIR No.: STAGE ITEM Checked by Checked by Date S/C CONT CONS. … Continue reading CHECKLIST FOR INSTALLATION OF COLD WATER PIPING SYSTEM Underground
CHECK LIST FOR INSTALLATION OF SLEEVES AND PUDDLE FLANGES FOR WATER WALL
CHECK LIST FOR: INSTALLATION OF SLEEVES AND PUDDLE FLANGES FOR WATER WALL. Ref. No: Rev. No: Page : 1 of 1 SUBCONTRACTOR X CONTRACTOR SECTION OF WORK: Water Supply LOCATION: LEVEL: Basement WIR No.: STAGE ITEM Checked by Checked by Date S/C CONT CONS. SETTING OUT… Continue reading CHECK LIST FOR INSTALLATION OF SLEEVES AND PUDDLE FLANGES FOR WATER WALL
Checklist For Above Ground Water Piping Installation
CHECK LIST FOR: INSTALLATION OF COLD AND HOT WATER PIPING SYSTEM AND ACCESSORIES Above Ground Ref. No: Rev. No: 0 Page : 1 of 1 SUBCONTRACTOR X CONTRACTOR SECTION OF WORK: Water supply LOCATION: LEVEL: WIR No.: STAGE ITEM Checked by Checked by Date S/C CONT CONS.… Continue reading Checklist For Above Ground Water Piping Installation
Air & Water balancing Method Statement
1. AIR BALANCING A. Fan Coil Units 1 Check that all automatic controls are fully commissioned and operating properly 2 All pre-commissioning checks have been carried out 3 Select the specified speed of the Fan Coil 4 Set all the dampers in the grill outlet at full open position 5 Take initial total flow of… Continue reading Air & Water balancing Method Statement
COMMISSIONING RECORD SPACE TEMPERATURE
COMMISSIONING RECORD SPACE TEMPERATURE
COMMISSIONING RECORD FAN PERFORMANCE
COMMISSIONING RECORD FAN PERFORMANCE
PRE-COMMISSIONING RECORD FAN MECHANICAL TEST SHEET
PRE-COMMISSIONING RECORD FAN MECHANICAL TEST SHEET
CONTRACTOR CHECK LIST FAN
CONTRACTOR CHECK LIST FAN
CONTRACTOR CHECK LIST AIR SYSTEM
CONTRACTOR CHECK LIST AIR SYSTEM
COMMMMISSIONING CERTIFICATE
COMMMMISSIONING CERTIFICATE