Method Statement Title: Testing and commissioning of Door Entry System

1.0       Scope

This method statement details the method of Testing and commissioning of Door Entry System.

            Note

1)         A separate Method Statement Ref. ETA/MS/E- 019 shall be submitted for Installation of the CCTV System.

2)         A separate Method Statement Ref. ETA/MS/E- 020 shall be submitted for Installation of the Access Control System.

3)         A separate Method Statement Ref. ETA/MS/E- 021 shall be submitted for Installation of the Audio Intercom/Video Intercom System

2.0       Material

  • All materials shall be as per approved material submittals.
  • Type and Sizes of cable shall be as per approved shop drawings / system manufacturers recommendation.

2.3       Type of Equipments/Devices shall be as per approved shop drawing.

3.0       Applicable Location

  • CCTV SYSTEM – Tower E1, E2, E3, W1, W2, W3 (Entrance Floor).
  • ACCESS CONTROL SYSTEM – Tower E1, E2, E3, W1, W2, W3 (Entry to the Building from the Podium Areas upto Level 2)
  • AUDIO INTERCOM – Tower E1, E2, E3, W1, W2, W3 (All Suites)
  • VIDEO INTERCOM – Villas (29nos)

4.0       Method

Find attached the manufacturer representative’s detailed method statement and test formats for testing and commissioning of  Door Entry System covering the mechanical checks, switching ON the unit. Programming and testing

The whole system will be commissioned and certified by the manufacturer’s representative before handing over.

5.0       Records

            6.1       Commissioning procedure with test results in attached format.

            6.2       Inspection request duly signed-off by NMX and Consultant.

            6.3       Certification of installation by SIBCA

6.0       Attachment

6.1       Manufacturer’s representative method statement detailing the pre-commissioning and commissioning procedures, including test formats

  • CCTV System
    • Access Control System
    • Audio Intercom/Video Intercom System

By Md Abu Zaed Khan

Hello, this is Engr. Zaed Khan Planning Engineer, Associate member of Society of Engineers UAE. Expert in construction project planning, FIDIC red book, computation of extension of time claim, Contract agreement and contractual letters.

Leave a comment

Your email address will not be published. Required fields are marked *

Exit mobile version