METHOD STATEMENT FOR EARTHING SYSTEM INSTALLATION

METHOD STATEMENT FOR EARTHING SYSTEM INSTALLATION

Method Statement Title: Installation of Earthing System

1.0       Scope

1.1       This method statement details the method of installation of Earthing System as per specification section 16060.

2.0       Material

2.1       Material used for the system is as per BS : 7671 and BS : 7430. 

3.0       Applicable Locations

4.0       Method

4.1       Storage  

6.0       Safety

6.1       All safety precautions shall be followed as per established project safety plan and procedure.

7.0       Records

7.1       Inspection request duly signed-off by NMX and Consultant.