Method statement of fixing of recessed type floor drain

Method statement of fixing of recessed type floor drain
Method statement of fixing of recessed type floor drain

Method Statement for Fixing Recessed Type Floor Drain

1. Introduction:
Recessed type floor drains are crucial components in plumbing systems, designed to efficiently remove wastewater from shower areas, bathrooms, and other wet spaces while providing a flush or nearly flush finish with the surrounding floor. Fixing a recessed type floor drain involves careful installation to ensure proper drainage and prevent water accumulation. This method statement provides a detailed step-by-step guide for fixing a recessed type floor drain, including safety precautions and adherence to standard guidelines.

2. Safety Precautions:
Before starting any work, ensure safety by following these precautions:

  • Turn off the main water supply to the area where the recessed type floor drain will be installed to prevent accidental water flow.
  • Wear appropriate personal protective equipment (PPE) such as gloves, safety goggles, and work boots to prevent injuries.
  • Use tools and equipment in accordance with manufacturer instructions and safety guidelines.
  • Work in a well-ventilated area to avoid exposure to harmful fumes from adhesives or sealants.
  • Keep the work area clean and free from obstacles to minimize the risk of accidents or tripping hazards.

3. Tools and Materials Required:

  • Recessed type floor drain unit
  • Adjustable wrench
  • Screwdriver set
  • Spirit level
  • Measuring tape
  • PVC primer and cement (if installing PVC drain)
  • Pipe cutter or hacksaw (if cutting pipes)
  • Gravel or aggregate (for sub-base)
  • Concrete mix (for floor leveling, if required)
  • Waterproofing membrane (if required)

4. Procedure:

Step 1: Preparation
1.1. Turn off the main water supply and clear the area where the recessed type floor drain will be installed.
1.2. Ensure the floor surface is clean, level, and free from debris.
1.3. Prepare any necessary materials and tools for installation.

Step 2: Determining Drain Location
2.1. Identify the location where the recessed type floor drain will be installed, considering factors such as drainage requirements and accessibility.
2.2. Use a spirit level to ensure the drain will be installed on a level surface.

Step 3: Cutting the Drainage Pipe (If Required)
3.1. If connecting the floor drain to an existing drainage system, measure and mark the pipe at the desired location for the drain connection.
3.2. Use a pipe cutter or hacksaw to carefully cut the pipe at the marked point.
3.3. Ensure the cut is clean and straight to accommodate the recessed drain unit.

Step 4: Installing the Recessed Drain
4.1. Place the recessed drain unit into the prepared opening in the floor, ensuring it fits securely.
4.2. Use a spirit level to check that the drain is level and properly positioned.
4.3. If using a PVC drain, apply primer to the pipe end and inside of the drain socket, followed by PVC cement. Insert the pipe into the socket and hold in place until set.
4.4. If using a stainless steel or other material drain, use screws or anchors to secure the drain to the floor.

Step 5: Connecting the Drainage Pipe
5.1. Connect the drainage pipe to the outlet of the recessed floor drain, ensuring a tight and secure fit.
5.2. Use an adjustable wrench to tighten any fittings or connections as necessary.
5.3. Apply pipe joint compound or Teflon tape to threaded connections to prevent leaks.

Step 6: Backfilling and Securing the Drain
6.1. Fill the space around the recessed drain with gravel or aggregate to provide support and prevent shifting.
6.2. Ensure the drain is securely anchored to the floor to prevent movement during use.
6.3. If required, pour concrete mix around the drain to level the floor surface and provide additional support.

Step 7: Waterproofing (If Required)
7.1. Apply a waterproofing membrane around the perimeter of the drain and over the surrounding floor area to prevent water damage.
7.2. Ensure the membrane is applied according to manufacturer instructions and overlaps the drain unit to create a watertight seal.

Step 8: Testing
8.1. Turn on the main water supply and check for any leaks around the drain connection.
8.2. Use a cloth or tissue to inspect for any signs of moisture.
8.3. Ensure the recessed drain effectively removes water and drains it away from the area.

Step 9: Compliance with Standards:
Ensure that the installation of the recessed type floor drain complies with relevant industry standards and guidelines, such as:

  • National Plumbing Code
  • Manufacturer’s Installation Instructions
  • Health and Safety Regulations

Step 10: Conclusion:
Fixing a recessed type floor drain requires attention to detail and adherence to safety standards to ensure effective drainage and prevent water damage. By following this method statement, you can achieve a professional installation that meets functional requirements and safety guidelines. Regular maintenance and inspection are recommended to ensure the recessed floor drain continues to operate effectively.

By Md Abu Zaed Khan

Hello, this is Engr. Zaed Khan Planning Engineer, Associate member of Society of Engineers UAE. Expert in construction project planning, FIDIC red book, computation of extension of time claim, Contract agreement and contractual letters.

Leave a comment

Your email address will not be published. Required fields are marked *

Exit mobile version