Site icon The Engineers Blog

Method statement of fixing of hand-held bidet

Method statement of fixing of hand-held bidet

Method statement of fixing of hand-held bidet

Method Statement for Fixing Hand-Held Bidet

1. Introduction:
A hand-held bidet, also known as a bidet sprayer or shattaf, is a device used for personal hygiene purposes in bathrooms. Fixing a hand-held bidet involves installing the spray unit and connecting it to the water supply. This method statement outlines the step-by-step procedure for fixing a hand-held bidet, including safety precautions and adherence to standard guidelines.

2. Safety Precautions:
Before commencing any work, prioritize safety by following these precautions:

3. Tools and Materials Required:

4. Procedure:

Step 1: Preparation
1.1. Turn off the water supply to the area where the hand-held bidet will be installed.
1.2. Clear the area around the toilet and ensure there is sufficient space to work comfortably.
1.3. Remove any existing fixtures or accessories that may interfere with the installation process.

Step 2: Mounting the Holder Bracket
2.1. Position the holder bracket on the wall next to the toilet, within easy reach.
2.2. Use a spirit level to ensure the bracket is horizontally aligned.
2.3. Mark the fixing points on the wall using a pencil.
2.4. Drill holes at the marked positions for the mounting screws or bolts, ensuring they are the appropriate size for a secure fit.
2.5. Securely fasten the holder bracket to the wall using screws or bolts and rawl plugs if necessary.

Step 3: Attaching the Bidet Hose
3.1. Connect one end of the bidet hose to the outlet port of the holder bracket.
3.2. Ensure the connection is tight and secure using an adjustable wrench.
3.3. Apply PTFE tape to the threaded end of the hose to create a watertight seal and prevent leaks.

Step 4: Installing the Hand-Held Bidet
4.1. Attach the hand-held bidet unit to the other end of the hose, ensuring a tight fit.
4.2. Use PTFE tape to seal the threaded connection and prevent leaks.
4.3. Adjust the angle of the hand-held bidet as needed to ensure comfortable use.

Step 5: Sealing and Finishing
5.1. Apply a bead of silicone sealant around the base of the holder bracket to create a waterproof seal and prevent water from seeping into the wall.
5.2. Smooth the sealant with a damp cloth or finger to achieve a neat finish.
5.3. Wipe off any excess sealant and allow sufficient time for it to cure before turning on the water supply.

Step 6: Testing
6.1. Turn on the water supply to the hand-held bidet and test for proper functionality.
6.2. Check for leaks or drips around the connections.
6.3. Test the hand-held bidet to ensure it provides adequate water pressure and coverage.

5. Compliance with Standards:
Ensure that the installation of the hand-held bidet complies with relevant industry standards and guidelines, such as:

6. Conclusion:
Fixing a hand-held bidet requires attention to detail and adherence to safety standards to ensure a successful installation. By following this method statement, you can achieve a professional installation that meets functional requirements and safety guidelines. Regular maintenance and inspection are recommended to prolong the lifespan of the hand-held bidet and ensure continued performance.

Exit mobile version