Method Statement for Fixing Concealed Cistern Tank
1. Introduction:
Fixing a concealed cistern tank is an essential part of modern bathroom design, providing a sleek and space-saving solution for toilet installations. Concealed cistern tanks are installed behind the wall, hidden from view, and operate silently. Proper installation ensures efficient water usage and a seamless finish in the bathroom. This method statement provides a detailed step-by-step guide for fixing a concealed cistern tank, including safety precautions and adherence to standard guidelines.
2. Safety Precautions:
Before commencing any work, ensure safety by following these precautions:
- Turn off the main water supply to the toilet.
- Wear appropriate personal protective equipment (PPE) such as gloves and safety goggles to prevent injuries.
- Use caution when handling heavy or bulky materials to avoid strains or accidents.
- Work in a well-ventilated area to avoid exposure to harmful fumes from adhesives or sealants.
- Keep the work area clean and free from obstacles to minimize the risk of accidents or tripping hazards.
3. Tools and Materials Required:
- Concealed cistern tank unit
- Mounting brackets or frame system
- Screws and wall plugs
- Adjustable wrench
- Screwdriver set
- Spirit level
- Measuring tape
- Silicone sealant
- Water supply hose
- Access panel (optional, for maintenance access)
4. Procedure:
Step 1: Preparation
1.1. Turn off the main water supply to the toilet.
1.2. Clear the area where the concealed cistern tank will be installed and ensure it is clean and dry.
1.3. Gather all necessary tools and materials for the installation.
Step 2: Installing the Mounting Brackets or Frame System
2.1. Determine the ideal location for the concealed cistern tank within the wall cavity.
2.2. Install the mounting brackets or frame system according to the manufacturer’s instructions, ensuring they are securely fixed to the wall studs.
2.3. Use a spirit level to ensure the mounting brackets or frame system is level both horizontally and vertically.
Step 3: Installing the Concealed Cistern Tank
3.1. Place the concealed cistern tank unit into the mounting brackets or frame system, ensuring it fits securely and aligns with the opening in the wall.
3.2. Connect the water supply hose to the inlet valve on the concealed cistern tank.
3.3. Use an adjustable wrench to tighten the connection securely, ensuring there are no leaks.
3.4. Apply silicone sealant around the edges of the opening in the wall to create a waterproof seal.
Step 4: Testing
4.1. Turn on the main water supply and fill the concealed cistern tank with water.
4.2. Check for any leaks around the water supply connections and the edges of the opening in the wall.
4.3. Flush the toilet several times to ensure proper functionality and check for any leaks or issues with the concealed cistern tank.
Step 5: Optional – Installing an Access Panel
5.1. If desired, install an access panel in the wall to provide easy access to the concealed cistern tank for maintenance or repairs.
5.2. Cut a hole in the wall at a convenient location and install the access panel according to the manufacturer’s instructions.
Step 6: Compliance with Standards:
Ensure that the installation of the concealed cistern tank complies with relevant industry standards and guidelines, such as:
- National Plumbing Code
- Manufacturer’s Installation Instructions
- Health and Safety Regulations
Step 7: Conclusion:
Fixing a concealed cistern tank requires attention to detail and adherence to safety standards to ensure efficient water usage and a seamless finish in the bathroom. By following this method statement, you can achieve a professional installation that meets functional requirements and safety guidelines. Regular maintenance and inspection are recommended to ensure the concealed cistern tank continues to operate effectively.



