Method Statement for Fixing Angle Valve
1. Introduction:
Angle valves, also known as stop valves or shut-off valves, are essential components in plumbing systems for controlling the flow of water. Fixing an angle valve involves installing it properly and connecting it to the water supply. This method statement provides a detailed step-by-step guide for fixing an angle valve, including safety precautions and adherence to standard guidelines.
2. Safety Precautions:
Before starting any work, ensure safety by following these precautions:
- Turn off the main water supply to the area where the angle valve will be installed to prevent accidental water flow.
- Wear appropriate personal protective equipment (PPE) such as gloves and safety goggles to prevent injuries.
- Use tools and equipment in accordance with manufacturer instructions and safety guidelines.
- Work in a well-ventilated area to avoid exposure to harmful fumes from adhesives or sealants.
- Keep the work area clean and free from obstacles to minimize the risk of accidents or tripping hazards.
3. Tools and Materials Required:
- Angle valve
- Adjustable wrench
- Pipe wrench
- Pipe cutter or hacksaw
- Teflon tape (PTFE tape)
- Plumbers’ putty or joint compound
- Pipe thread sealant
- Spirit level
- Measuring tape
4. Procedure:
Step 1: Preparation
1.1. Turn off the main water supply to the area where the angle valve will be installed.
1.2. Clear the area around the pipe where the valve will be fixed, ensuring there is enough space to work comfortably.
1.3. Ensure all necessary tools and materials are readily available.
Step 2: Determining Valve Location
2.1. Identify the location where the angle valve will be installed on the water supply pipe.
2.2. Consider accessibility and ease of operation when selecting the installation site.
Step 3: Cutting the Pipe (If Required)
3.1. If the pipe needs to be cut to install the angle valve, measure and mark the pipe at the desired location.
3.2. Use a pipe cutter or hacksaw to carefully cut the pipe at the marked point.
3.3. Ensure the cut is clean and straight to facilitate a proper connection with the angle valve.
Step 4: Applying Thread Sealant
4.1. Apply pipe thread sealant to the male threads of the angle valve.
4.2. Ensure the threads are fully coated with sealant to prevent leaks.
Step 5: Attaching the Angle Valve
5.1. Position the angle valve onto the pipe, aligning the threaded end with the cut or uncut section of the pipe.
5.2. Tighten the valve onto the pipe using an adjustable wrench, ensuring a secure connection.
5.3. Use a pipe wrench to hold the pipe steady while tightening the valve to prevent damage.
Step 6: Sealing the Connection
6.1. Wrap Teflon tape (PTFE tape) around the threads of the valve to create a tight seal.
6.2. Apply plumbers’ putty or joint compound around the base of the valve to further seal the connection.
6.3. Wipe off any excess putty or compound to ensure a clean finish.
Step 7: Testing
7.1. Turn on the main water supply and check for any leaks around the valve connection.
7.2. Use a cloth or tissue to inspect for any signs of moisture.
7.3. Tighten any connections if necessary to eliminate leaks.
Step 8: Compliance with Standards:
Ensure that the installation of the angle valve complies with relevant industry standards and guidelines, such as:
- National Plumbing Code
- Manufacturer’s Installation Instructions
- Health and Safety Regulations
Step 9: Conclusion:
Fixing an angle valve requires attention to detail and adherence to safety standards to ensure a successful installation. By following this method statement, you can achieve a professional installation that meets functional requirements and safety guidelines. Regular maintenance and inspection are recommended to ensure the valve continues to operate effectively.



