METHOD STATEMENT FOR Drainage Piping System

uPVC High Pressure Water Supply Piping System Installation Procedure

uPVC High Pressure Water Supply Piping System Installation Procedure

METHOD STATEMENT FOR Drainage Piping System

CONTENTS

CONTENTS………………………………………………………………………………………………………….

1.0       Scope……………………………………………………………………………………………………. 3

2.0     REFERENCES……………………………………………………………………………………………………………………………………………………………..3

3.0       Responsibilities………………………………………………………………………………… 3

4.0       SEQUENCING………………………………………………………………………………………….. 4

5.0       CONSTRUCTION PROCEDURES……………………………………………………………… 4

6.0       TESTING………………………………………………………………………………………………… 5

7.0      EQUPMENT.……………………………………………………………………………………………………………………………………..5

8.0       Materials……………………………………………………………………………………………. 5

9.0       Environmental Considerations…………………………………………………… 6

10.0    Attachments……………………………………………………………………………………… 6

Attachment 1: Key to Safety Symbols…………………………………………………………………………….. 7

This method statment describe the specfic safe working method which will be use by Orasccom to carry out the Drainig Piping System , it gives details of how the work will be carried out , what health and safty issues and controls are involved.

Approved Transmittal No: PKG #75&76 – MT- PL – 00043- Rev. 01

Approved Transmittal No : PKG #75&76 – MT- PL – 00042- Rev. 01

               All as per OCI procedures: