Mandatory Checklist for Crib Retaining Wall Foundation Design.

Mandatory Checklist for Crib Retaining Wall Foundation Design.

Designing the foundation for a crib retaining wall involves considerations for stability, bearing capacity, and soil-structure interaction. Below is a detailed checklist with explanations and examples for the design of a crib retaining wall foundation:

1. Site Investigation:

  • Explanation: Conduct a thorough site investigation to understand soil conditions.
  • Example: Perform soil tests (SPT, CPT) to determine soil properties, bearing capacity, and potential sliding or settlement.

2. Load Analysis:

  • Explanation: Analyze and calculate loads acting on the crib retaining wall.
  • Example: Consider the weight of the wall, backfill soil pressure, surcharge loads, water pressure, and seismic loads to determine the total lateral load.

3. Bearing Capacity:

  • Explanation: Ensure that the soil bearing capacity is sufficient for the applied loads.
  • Example: If the total lateral load is 120 kN/m and the soil bearing capacity is 200 kN/m², the foundation is considered suitable.

4. Sliding Stability:

  • Explanation: Check and ensure the foundation resists sliding.
  • Example: Calculate the sliding force and compare it to the resisting force provided by the foundation. Use appropriate safety factors.

5. Overturning Stability:

  • Explanation: Verify the foundation’s resistance to overturning.
  • Example: Assess the moments and forces acting on the crib wall and ensure they are counteracted by the resisting moments and forces provided by the foundation.

6. Foundation Geometry:

  • Explanation: Determine the appropriate dimensions and shape of the foundation.
  • Example: Design a rectangular or trapezoidal foundation with dimensions that distribute the loads evenly along the length of the crib wall.

7. Reinforcement:

  • Explanation: Specify reinforcement in the foundation, if required.
  • Example: Include reinforcing bars in the foundation to enhance its tensile strength and improve overall stability.

8. Foundation Depth:

  • Explanation: Determine the optimal foundation depth for stability.
  • Example: Increase the foundation depth if weak or compressible soil layers are present near the surface.

9. Toe and Heel Details:

  • Explanation: Address toe and heel details to enhance stability.
  • Example: Extend the foundation in the direction of potential sliding (toe) and provide a keying-in detail to resist sliding.

10. Drainage:

  • Explanation: Implement drainage measures to reduce hydrostatic pressure.
  • Example: Install drainage pipes behind the crib wall to relieve water pressure and prevent water accumulation.

11. Backfill Compaction:

  • Explanation: Specify compaction requirements for the backfill soil.
  • Example: Compaction should be done in lifts with specified moisture content to achieve adequate density.

12. Crib Wall Connection:

  • Explanation: Detail the connection between the foundation and crib wall.
  • Example: Use reinforcing bars extending from the foundation into the crib wall to ensure a secure connection.

13. Construction Sequence:

  • Explanation: Develop a construction sequence that ensures stability during and after construction.
  • Example: Excavate, place and compact the foundation material, construct the crib wall, and ensure proper compaction of the backfill.

14. Quality Control:

  • Explanation: Implement quality control measures during construction.
  • Example: Monitor the compaction of backfill, check reinforcement placement, and verify the dimensions of the foundation.

15. Code Compliance:

  • Explanation: Ensure compliance with local building codes and standards.
  • Example: Adhere to relevant codes such as AASHTO LRFD Bridge Design Specifications or local geotechnical standards.

16. Professional Engineer Involvement:

  • Explanation: Engage a qualified geotechnical and structural engineer to oversee the design.
  • Example: Have licensed engineers review and approve the crib retaining wall foundation design to ensure it meets safety and code requirements.

17. Record Keeping:

  • Explanation: Maintain detailed records of the crib retaining wall foundation design process.
  • Example: Document all design calculations, soil test results, construction activities, and as-built drawings for future reference and audits.

By following this checklist, engineers can ensure a well-designed crib retaining wall foundation that effectively resists lateral loads, provides stability, and minimizes potential failure modes.