Date: xxx Ref. xxx Kind Attn: Mr. xxx Project: 2B + G + 14+ Lower Roof Hotels Building Plot No.: xxx at Al Barsha 1st, Dubai Subject : Instruction to review the swimming pool drawings and claim for the variation. Dear MEP team, With reference to the above, we would like to inform you […]
Contractor’s Letters
REQUEST FOR THE FEEDBACK OF ID DRAWINGS
Date: xxx Ref. xxx Kind Attn: Mr. xxx Project: 2B + G + 14+ Lower Roof Hotels Building Plot No.: xxx at Al Barsha 1st, Dubai Subject : REQUEST FOR THE FEEDBACK OF ID DRAWINGS Dear MEP team, With reference to the above, we would like to inform you that we have submitted ID
REQUEST FOR THE FEEDBACK OF ID DRAWINGS Read Post »
Protocol for Permission from QA/QC Division and Time for Approval
Date: xxx Ref. xxx Kind Attn: Mr. xxx Project: 2B + G + 14+ Lower Roof Hotels Building Plot No.: xxx at Al Barsha 1st, Dubai Subject : Protocol for Permission from QA/QC Division and Time for Approval Dear Mr. Teja, The protocol of cutting/changing/ core cutting /breaking of wall at any part of
Protocol for Permission from QA/QC Division and Time for Approval Read Post »
Regarding follow up of pending work
Date: xxx Ref. xxx Kind Attn: Mr. xxx Project: 2B + G + 14+ Lower Roof Hotels Building Plot No.: xxx at Al Barsha 1st, Dubai Subject: Regarding follow up of pending work Dear Tahir, With ref. to above, the following are to be submitted to consultant. Inclusion/ exclusion items to be submitted Long
Regarding follow up of pending work Read Post »
Requirement of drawings for mock up room
Date: xxx Ref. xxx Kind Attn: Mr. xxx Project: 2B + G + 14+ Lower Roof Hotels Building Plot No.: xxx at Al Barsha 1st, Dubai Subject: Requirement of drawings for mock up room Dear Tahir, With ref. to above, we require total number of MEP drawings which include water supply, exhaust, any ducts
Requirement of drawings for mock up room Read Post »
Issue regarding non availability of lights at site for working during evening
Date: xxx Ref. xxx Kind Attn: Mr. xxx Project: 2B + G + 14+ Lower Roof Hotels Building Plot No.: xxx at Al Barsha 1st, Dubai Subject: Issue regarding non availability of lights at site for working during evening Dear Tahir, With ref. to above, there are many confined areas where we are working
Issue regarding non availability of lights at site for working during evening Read Post »
Regarding MP Coordination layout
Date: xxx Ref. xxx Kind Attn: Mr. xxx Project: 2B + G + 14+ Lower Roof Hotels Building Plot No.: xxx at Al Barsha 1st, Dubai Subject: Regarding MP Coordination layout Dear Tahir, With ref. to above, we need impact analysis, kindly provide us the following If we are implementing the change of wiring
Regarding MP Coordination layout Read Post »
In continuation for MEP coordination, from ref. xxx
Date: xxx Ref. xxx Kind Attn: Mr. xxx Project: 2B + G + 14+ Lower Roof Hotels Building Plot No.: xxx at Al Barsha 1st, Dubai Subject: In continuation for MEP coordination, from ref. CC/MEP/03 Dear Tahir, In continuation for MEP coordination, from ref CC/MEP/03, kindly review the following. Propose the generator supplier
In continuation for MEP coordination, from ref. xxx Read Post »
Minutes of meeting held with Mr. xxx (MEP-Coordinator)
Date: xxx Ref. xxx Kind Attn: Mr. xxx Project: 2B + G + 14+ Lower Roof Hotels Building Plot No.: xxx at Al Barsha 1st, Dubai Subject: Minutes of meeting held with Mr. xxx (MEP-Coordinator) Dear MEP Team, With reference to the above, we require the following: Status of drawings or Electrical
Minutes of meeting held with Mr. xxx (MEP-Coordinator) Read Post »
Fixing of Water Faucet & Water Cooler
Date: xxx Ref. xxx Kind Attn: Mr. xxx Project: 2B + G + 14+ Lower Roof Hotels Building Plot No.: xxx at Al Barsha 1st, Dubai Subject: Fixing of Water Faucet & Water Cooler Dear MEP Team, With reference to the above, the water faucet in the wash room is broken and
Fixing of Water Faucet & Water Cooler Read Post »