Contractor’s Letters

concrete-pool-deck

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject          :  Instruction to review the swimming pool  drawings and claim for the variation. Dear MEP team, With reference to the above, we would like to inform you […]

Read Post »

Site Meeting

Protocol for Permission from QA/QC Division and Time for Approval

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject          :  Protocol for Permission from QA/QC Division and Time for Approval Dear Mr. Teja, The protocol of cutting/changing/ core cutting /breaking of wall at any part of

Protocol for Permission from QA/QC Division and Time for Approval Read Post »

Reply - Notice of Delay

Regarding follow up of pending work

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:         Regarding follow up of pending work Dear Tahir, With ref. to above, the following are to be submitted to consultant. Inclusion/ exclusion items to be submitted Long

Regarding follow up of pending work Read Post »

Dark and Light

Issue regarding non availability of lights at site for working during evening

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:         Issue regarding non availability of lights at site for working during evening Dear Tahir, With ref. to above, there are many confined areas where we are working

Issue regarding non availability of lights at site for working during evening Read Post »

calculate the variation from tender and revised drawing

Regarding MP Coordination layout

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:        Regarding MP Coordination layout Dear Tahir, With ref. to above, we need impact analysis, kindly provide us the following If we are implementing the change of wiring

Regarding MP Coordination layout Read Post »

Engineering Submittals

In continuation for MEP coordination, from ref. xxx

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:           In continuation for MEP coordination, from ref. CC/MEP/03 Dear Tahir, In continuation for MEP coordination, from ref CC/MEP/03, kindly review the following. Propose the generator supplier

In continuation for MEP coordination, from ref. xxx Read Post »

shake-up-sales-meeting

Minutes of meeting held with Mr. xxx (MEP-Coordinator)

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:          Minutes of meeting held with Mr. xxx (MEP-Coordinator) Dear MEP Team,             With reference to the above, we require the following: Status of drawings or Electrical

Minutes of meeting held with Mr. xxx (MEP-Coordinator) Read Post »

Water cooler

Fixing of Water Faucet & Water Cooler

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:          Fixing of Water Faucet & Water Cooler Dear MEP Team,             With reference to the above, the water faucet in the wash room is broken and

Fixing of Water Faucet & Water Cooler Read Post »