MONTHLY PROGRESS REPORT

                                      MONTHLY PROGRESS REPORT NO. 13                                                      Month Ending 30th of September 2016                 Project No                   :         xxx                 Project Title                :         2B+GF+14 Floors+ Lower Roof Hotel Building                 Client                          :         xxx                                       Consultant                   :         xxxx Consulting Architechs & Engineers                                       Contractor                  :         xxx Contracting L.L.C. Table of Contents: Executive Summary…………………………………………………………………Section 1 Progress Report………………………………………………………………………Section […]

METHOD STATEMENT FOR THE RAFT CONCRETE for the GENERAL AREA ( A2)including VERTICAL WALL AT PUMP ROOM/ WATER TANK AREA

Purpose of WorkThis work procedure describes the method to be adopted for Basement Raft concreting work for the General Area as shown in the drawings and as directed by the engineer in charge. Reference Contract Specification.o C40/20 OPC (120kg)+70% GGBS(280KG) Applicable drawings.o DM Approved drawing Equipment’s Required Concrete Placer Pump with 48m arm length -01 No. Concrete Placer Pump with […]