CHECK SHEET FOR INSTALLATION OF ROOF DRAIN, FUNNEL FLOOR DRAIN & FLOWER BED DRAIN
CHECK SHEET FOR: INSTALLATION OF ROOF DRAIN, FUNNEL FLOOR DRAIN & FLOWER BED DRAIN | Ref. No: FM-6012-0065 Rev. No: 00 Page : 1 of 1 Date : 23-02-2013 |
SUBCONTRACTOR | X | CONTRACTOR |
SECTION OF WORK: Plumbing LOCATION: |
STAGE | ITEM | Checked by | Checked by | Date |
ASEM | ALJABER | ADNOC | |
| | | | | | | | |
SETTING OUT | Check Layout | | | | |
Check Level, Check level debt | | | | |
MEP/CIVIL | Check for Services Clearances | | | | |
INSTALLATION | Check materials are as per approved material submittal. | | | | |
| Check that there are no re-bar protrusions on the openings. | | | | |
| Check that size of opening as per approved builder’s work lay-out or structural lay-out. | | | | |
| Check that proper alignment of drains. | | | | |
| Check installation details as per the approved shop drawings. | | | | |
| Check that pipes have been tested for leaks. | | | | |
| Check that supports are installed correctly as per approved support detail for the drains. | | | | |
| Barricade & Cover all installed drains after fixing to avoid any damage. | | | | |
| | | | | |
| | | | | |
For ASEM QA/QC: | Date: | FOR ALJABER QA/QC: | Date: | For ADNOC Rep.: | Date: |
Name: | Sign: | Name: | Sign: | Name: | Sign: |