Date: xxx
Ref: xxx
Kind Attn :Mr. xxx
Project: 2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai
Subject : Regarding nomination of the UPS supplier and finalization of the UPS room for coordination with low voltage sub contractors.
Dear Sir,
With reference to above we would like to inform you that the xxx Emirates required the UPS supplier nomination and the UPS configuration for the required connectivity and the location for UPS to be finalize immediately.
So the xxx Emirates have serious concern now for nomination of the UPS supplier and location of the room as well as the parameter of the connectivity with UPS.
This is for your kind information and to do needful as soon as possible.
Regards,
For xxx Contracting L.L.C.
xxx
Project Manager