METHOD STATEMENT FOR EARTHING SYSTEM INSTALLATION

Method Statement Title: Installation of Earthing System

Method Statement Title: Installation of Earthing System 1.0       Scope 1.1       This method statement details the method of installation of Earthing System as per specification section 16060. 2.0       Material 2.1       Material used for the system is as per BS : 7671 and BS : 7430.  3.0       Applicable Locations 4.0       Method 4.1       Storage   6.0       Safety 6.1      

Method Statement Title: Installation of Earthing System Read Post »

METHOD STATEMENT FOR LV SWITCHGEAR AND MOTOR CONTROL CENTER INSTALLATION

Method Statement Title: Installation of Motor Control Centre ( MCC ) & Variable Frequency Drives ( VFDs )

Method Statement Title: Installation of Motor Control Centre ( MCC ) & Variable Frequency Drives ( VFDs ) 1.0       Scope This method statement details the method of installation of Motor Control Centres and Variable Frequency Drives, as per project Specification Sections 16472 and 15725.             Note: A separate Method Statements shall be submitted for testing

Method Statement Title: Installation of Motor Control Centre ( MCC ) & Variable Frequency Drives ( VFDs ) Read Post »

METHOD STATEMENT FOR POWER FACTOR CORRECTION CAPACITORS INSTALLATION

Method Statement Title: Installation of Capacitor Banks

1.0       Scope 2.0       Material 3.0       Applicable Location 4.0       Method 4.1       Storage   4.2       Installation 4.2.1    Ensure approved documents like shop drawing and electrical room             layouts are available with the installation team.             channel.                                     pieces fallen during cable cutting and terminating process.                                     specification requirement. 5.0       Safety 5.1       Safety Officer shall ensure that the

Method Statement Title: Installation of Capacitor Banks Read Post »

METHOD STATEMENT FOR LIGHTING FIXTURES INSTALLATION

Method Statement Title: Installation of Light Fixtures.

1.0       Scope This method statement details the method of installation of Lighting Fixtures as per Project Specification 16505.             Note             A separate Method Statement Ref. ETA/MS/E-40 shall be submitted for testing and commissioning of the Lighting Fixtures. 2.0       Material 2.3       Type of  luminaries shall be as per approved shop drawings. 3.0       Applicable Location            

Method Statement Title: Installation of Light Fixtures. Read Post »

METHOD STATEMENT FOR LV SWITCHGEAR AND MOTOR CONTROL CENTER INSTALLATION

Method Statement Title: Installation, Testing and Commissioning of Sub Main Distribution Boards (SMDB’s)

1.0       Scope 2.0       Material 3.0       Applicable Location 4.0       Method 4.1       Storage   4.2       Installation 5.0       Testing & Commissioning:             5.1       Instruments. Note : The instruments used for  testing and commissioning shall be checked and ensured that they are calibrated and the current valid calibration reports are filed for record.           5.2         Method 6.0       Safety 6.1      

Method Statement Title: Installation, Testing and Commissioning of Sub Main Distribution Boards (SMDB’s) Read Post »

METHOD STATEMENT FOR LV SWITCHGEAR AND MOTOR CONTROL CENTER INSTALLATION

Method Statement Title: Installation of Distribution Boards (DB’s)

1.0       Scope 1.1       This method statement details the method of installation of Distribution Boards (DBs). 2.0       Material 3.0       Applicable Location 4.0       Method 4.1       Storage   4.2       Installation 5.0       Safety 5.1       All safety precautions shall be followed as per established project safety plan and procedure. 6.0       Records             6.1       Inspection request duly signed-off by NMX and

Method Statement Title: Installation of Distribution Boards (DB’s) Read Post »

METHOD STATEMENT ISOLATORS

Method Statement Title: Installation of Isolators & Switching accessories.

1.0       Scope 1.1       This method statement details the method of installation of Isolators & Switching accessories. 2.0       Material 3.0       Applicable Location 4.0       Method 4.1       Storage   4.2       Installation 6.0       Records             6.2       Inspection request duly signed-off by NMX and Consultant.

Method Statement Title: Installation of Isolators & Switching accessories. Read Post »

METHOD STATEMENT FOR LV SWITCHGEAR AND MOTOR CONTROL CENTER INSTALLATION

Method Statement Title: Installation of Low Voltage Panels (LVP’s).

1.0       Scope Note : A separate Method Statement ref. ETA/MS/E-29 shall be submitted for Testing & Commissioning. 2.0       Material 3.0       Applicable Location 4.0       Method Note: L.V. Panels will be offered for factory inspection/witness by Design Consultant prior to material dispatch 4.2       Installation 6.0       Records             6.1       QC Inspection Check List. 7.0       Attachment

Method Statement Title: Installation of Low Voltage Panels (LVP’s). Read Post »