Requirement of drawings for mock up room

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:         Requirement of drawings for mock up room Dear Tahir, With ref. to above, we require total number of MEP drawings which include water supply, exhaust, any ducts or machine and AC drawings […]

Issue regarding non availability of lights at site for working during evening

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:         Issue regarding non availability of lights at site for working during evening Dear Tahir, With ref. to above, there are many confined areas where we are working till evening on every floor […]

Regarding MP Coordination layout

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:        Regarding MP Coordination layout Dear Tahir, With ref. to above, we need impact analysis, kindly provide us the following If we are implementing the change of wiring diagram for Room management system […]

In continuation for MEP coordination, from ref. xxx

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:           In continuation for MEP coordination, from ref. CC/MEP/03 Dear Tahir, In continuation for MEP coordination, from ref CC/MEP/03, kindly review the following. Propose the generator supplier and generator size from drawing […]

Minutes of meeting held with Mr. xxx (MEP-Coordinator)

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:          Minutes of meeting held with Mr. xxx (MEP-Coordinator) Dear MEP Team,             With reference to the above, we require the following: Status of drawings or Electrical Power layout of entire project. […]

Fixing of Water Faucet & Water Cooler

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:          Fixing of Water Faucet & Water Cooler Dear MEP Team,             With reference to the above, the water faucet in the wash room is broken and no one in your side […]

Site Instruction for MEP works

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:          Site Instruction Dear Mr. Tahir, With reference to above mentioned subject, we are hereby conforming that from the next slab we need the following from you. You are not allowed to […]

Toilet sequence or drainage Piping

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:           Toilet sequence or drainage Piping Dear Mr. Tahir, With reference to above mentioned subject, as we discuss since many months to provide roof coordinated layout with dimension including weight of foundation […]

Regarding cost variation for modification and main entrance area Glazing work around the revolving door at G.F

Date: xxx Ref. xxx To:                     M/s. xxx , Metal Wowks Project:              2B + G + 14 + Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject : Regarding cost variation for modification and main entrance area Glazing work around the revolving door at G.F Dear Engr. Mansour , With reference to above there is a […]