Dark and Light

Issue regarding non availability of lights at site for working during evening

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:         Issue regarding non availability of lights at site for working during evening Dear Tahir, With ref. to above, there are many confined areas where we are working

Issue regarding non availability of lights at site for working during evening Read Post »

calculate the variation from tender and revised drawing

Regarding MP Coordination layout

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:        Regarding MP Coordination layout Dear Tahir, With ref. to above, we need impact analysis, kindly provide us the following If we are implementing the change of wiring

Regarding MP Coordination layout Read Post »

Engineering Submittals

In continuation for MEP coordination, from ref. xxx

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:           In continuation for MEP coordination, from ref. CC/MEP/03 Dear Tahir, In continuation for MEP coordination, from ref CC/MEP/03, kindly review the following. Propose the generator supplier

In continuation for MEP coordination, from ref. xxx Read Post »

shake-up-sales-meeting

Minutes of meeting held with Mr. xxx (MEP-Coordinator)

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:          Minutes of meeting held with Mr. xxx (MEP-Coordinator) Dear MEP Team,             With reference to the above, we require the following: Status of drawings or Electrical

Minutes of meeting held with Mr. xxx (MEP-Coordinator) Read Post »

Water cooler

Fixing of Water Faucet & Water Cooler

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:          Fixing of Water Faucet & Water Cooler Dear MEP Team,             With reference to the above, the water faucet in the wash room is broken and

Fixing of Water Faucet & Water Cooler Read Post »

The Engineers

Site Instruction for MEP works

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:          Site Instruction Dear Mr. Tahir, With reference to above mentioned subject, we are hereby conforming that from the next slab we need the following from you.

Site Instruction for MEP works Read Post »

Drainage Piping

Toilet sequence or drainage Piping

Date: xxx Ref. xxx Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          xxx at Al Barsha 1st, Dubai Subject:           Toilet sequence or drainage Piping Dear Mr. Tahir, With reference to above mentioned subject, as we discuss since many months to provide roof coordinated layout with

Toilet sequence or drainage Piping Read Post »

Keys Handing over

Regarding no worker from our end to complete the remaining works and hand over the site

Date: xxx Ref. xxx To:                     M/s. xxx , Metal Wowks Project:              2B + G + 14 + Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject : Regarding no worker from our end to complete the remaining works and hand over the site   Dear Engr. Mansour , With reference

Regarding no worker from our end to complete the remaining works and hand over the site Read Post »

Regarding the issue of new building permit

Regarding cost variation for modification and main entrance area Glazing work around the revolving door at G.F

Date: xxx Ref. xxx To:                     M/s. xxx , Metal Wowks Project:              2B + G + 14 + Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject : Regarding cost variation for modification and main entrance area Glazing work around the revolving door at G.F Dear Engr. Mansour , With reference

Regarding cost variation for modification and main entrance area Glazing work around the revolving door at G.F Read Post »