Regarding GSM drawing for coordination and GSM related work to be execute prior to closing the ceiling.

Ref  :  xxx  Date:   09/01/2018 To,        The Manager        Etisalat Attn : Mr. Muhamed ( 0561933216) Subject :  Regarding GSM drawing for coordination and GSM related work to be execute prior to closing the ceiling. Dear Sir,              With reference to above and the information provided by our client ( Mr. John Cherian) that he submitted all required documents […]

Application no –E964644 for substation inspection and our under taking letter for Tower carne as well as logistic support to shift the transformer.

Date: xxx Ref no: CC/DEWA/004/17  To,  Senior Manager  Design Approval  Dewa,Dubai Project            : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Client              : Al Sheikh Faisal Bin Khalid Sultan Al Qassemi.  Subject           : Application no –E964644 for substation inspection and our under taking letter for Tower carne as well as logistic support […]

Application no –E964644 for substation inspection and our under taking letter for Tower carne as well as logistic support to shift the transformer.

Date: xxx Ref no: CC/DEWA/003/17  To,  Mr. xxx  Head of the Inspection Department  Dewa,Dubai Project            : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Client              : Al Sheikh Faisal Bin Khalid Sultan Al Qassemi.  Subject           : Application no –E964644 for substation inspection and our under taking letter for Tower carne as well […]

Application no –E964644 for substation inspection and our under taking letter for Tower carne as well as logistic support to shift the transformer.

Date: xxx Ref no: CC/DEWA/002/17 To,  Mr. Marwan Karani  Head of the Inspection Department  Dewa,Dubai Project            : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at  Barsha, Dubai Client              : Al Sheikh Faisal Bin Khalid Sultan Al Qassemi.  Subject         : Application no –E964644 for substation inspection and our under taking letter for Tower carne as […]

Our under taking letter for Tower carne removal within 70 days before transformer arrives.

Date: xxx Ref no: CC/DEWA/001/17 To                   : DEWA Project           : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai    Subject         : Our under taking letter for Tower carne removal within 70 days before transformer failure. Dear Sir, We would like to request you that our substation inspection not being cleared due to […]

Our observation on the tile and awaited for your response

Date: xxx Ref:   CC/269/EVT/01 To:                   The Manager, Envirotec General Trading LLC Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha 1st, Dubai, and U.A.E Subject:           Our observation on the tile and awaited for your response Dear Sir, With ref. to above, as per our previous communication we are getting calls to release […]

Regarding technical and chemical details of the admixture

Date: xxx Ref:   CC/269/CP/02 To:                   Al Ghurair Ready Mix Concrete Plant                         AL quoz, Dubai Project:           2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha 1st, Dubai, U.A.E Subject:          Regarding technical and chemical details of the admixture Dear Sir, With ref. to your letter AGC-R/GEN/157/16 dated 9th October, provide us complete chemical and […]

To propose the admixture (retarder) to delay the setting time of cement and that will not affect the properties of concrete including durability and strength

Date: xxx Ref:   CC/269/CP/02 To:                   Al Ghurair Ready Mix Concrete Plant                         AL quoz, Dubai Project:           2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha 1st, Dubai, U.A.E Subject:          To propose the admixture (retarder) to delay the setting time of cement and that will not affect the properties of concrete including durability and […]

Request for testing of the anchor for the above mentioned project

Date: xxx Ref:   CC/269/lab/01 To:                   Al Hothy-Stranger Laboratory Project:           2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha 1st, Dubai, U.A.E Subject:          Request for testing of the anchor for the above mentioned project Dear Sir, With ref. to the above, we are submitting here with the anchor material for testing as per details […]

Request to provide confirmation of maximum time allowable to use the Drymix at the site.

Date: xxx Ref:   CC/269/qmix/01 To:                   Q.Mix Kind Attn:        The Manager Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha 1st,        Dubai U.A.E Subject:           Request to provide confirmation of maximum time allowable to use the Drymix at the site which is our consultant – “Arkiplan Consulting Architects and Engineers” requirement for our above […]