Work order for Mineral wool panel with Al foil faced insulation (Rockwool)

Rockwool panel

Rockwool panel

Date: xxx

CC/269/CI/06

Kind Attn:   The Manager, xxx Interior Division          

Project:       2B + G + 14 + Lower Roof Hotel Building

Plot No.       373-1297 at Barsha, Dubai

Subject:       Work order for Mineral wool panel with Al foil faced insulation (Rockwool)

Dear xxx,

With ref. to above, please note the following,

  1. Scope of work:
  1. Rockwool panel  with aluminum foil faced  insulation, installation from Fujairah rockwool  – density= 45kg/m3 50mm thickness as per MR attached
  2. Rockwool panel to be fixed with PVC accessories and cap.
  3. GI grid to be prepared as per the section details attached
  4. The 12.5mm Gypsum board to be fixed on the grid next to rockwool with contact in perfect level

       Area: 300sqm

Location: Basement-01

 As per interdivision and company policy

Immediately and to be fixed within a week (Start and finish within 7 days)

 Mr.Ramlal Pareek- 0554714645

  1. All materials to be delivered along with DO and specification details and inspection to be carried out prior to fixing by QA/QC Engineer – Alma and Consultant
  2. Safety induction to be carried out and workers must have PPE

Regards,

For xxx Contracting L.L.C

xxx

General Manager