Date: xxx
Ref. xxx
To:
M/s. xxx Consulting Architects and Engineers
Dubai, UAE
Kind Attn: Mr. xxx
Project: 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai.
Subject: Submission of the pile rebar cutting detail on West /Rear side
Dear Sir,
With reference to the above subject, please find detail for the Rebar Cut by SS Lootha as well as rebar exposed at the piles which modified by SS Lootha and please note the following.
Pile No. | Remarks |
03, 05, 07 | Total 7 no. of rebar along with stirrup has been cut on every pile. |
10 | 5 no. of rebar is cut with stripus |
11 | 1 no of rebar is cut with striups |
16, 17 | Only concrete cover and rebar exposed without cutting. |
So this is for your kind information and as you instructed to prepare the Technical detail as per DM Required.
Furthermore the marking on the pile drawing is attached herewith as you instructed today morning to prepare and provide your technical report to DM.
Regards,
For xxx Contracting L.L.C
xxx
Project Manager