Sale!

Construction Handbook for Ground+First+Roof Villa | 18-Month Cost-Loaded .xer + S-Curve

Rated 5.00 out of 5 based on 2 customer ratings
(2 customer reviews)

Original price was: 32,00 $.Current price is: 12,00 $.

Complete Ground First Roof Villa construction handbook. 18-month Primavera P6 .xer with cost-loaded activities, S-curve analysis, manpower histogram, equipment schedule. Instant digital download.

Guaranteed Safe Checkout

Ground First Roof Villa Construction Handbook

This professional construction handbook delivers a detailed L4 baseline schedule with cost, manpower, and plant & equipment fully loaded for a Ground, First and Roof Floor Villa. The 18-month programme (including 1-month mobilization) follows logical construction sequence with comprehensive WBS structure.

Package Contents

  • Primavera P6 Programme (.xer) — 18-month resources loaded baseline schedule with cost, manpower, and equipment
  • S-Curve & Cash Flow — Professional format with cumulative cost and progress curves
  • Manpower Histogram — Trade-wise resource loading with peak demand analysis
  • Plant & Equipment Schedule — Equipment utilization across project timeline
  • Month-wise Activity & KPIs — MS Excel with major milestones and performance indicators

High-Level WBS Structure

WBS Level Scope
1.0 Pre-Commencement: LOA, Contract, NOC, Approved Drawings, Commencement Letter
2.0 Engineering Submissions & Approvals (Subcontractor Pre-qual, PS/PC Items, Materials, Shop Drawings)
3.0 Engineering Procurement (Civil & MEP Long Lead Items)
4.0 Construction Works: Substructure, Superstructure, Finishes (Internal/External)
5.0 MEP Works: Power & Lighting, ELV/Home Automation, Water Supply, Drainage, HVAC, Fire Systems
6.0 Completion: Substantial Completion, Authority Approval, Snagging, Testing & Commissioning
7.0 Handover to Client

Key Features

  • 18-Month Duration: Including 1-month mobilization period
  • Cost-Loaded: Every activity linked to BOQ items with cost breakdown
  • Manpower-Loaded: Trade-wise histograms showing peak workforce requirements
  • Equipment-Loaded: Plant & machinery utilization schedules
  • L4 Detail: Granular activities suitable for monthly progress reporting
  • Primavera .xer Format: Import-ready for P6, compatible with progress updating

Who Needs This Handbook

  • Planning Engineers preparing baseline submissions for 3-story villas
  • Project Managers tracking cost & resource performance
  • Quantity Surveyors validating cash flow forecasts
  • Contractors bidding Ground+First+Roof villa projects
  • Consultants reviewing contractor programmes

Related Construction Programme Resources

Instant Digital Download

Upon purchase, receive immediate access to .xer Primavera file, Excel KPIs, and PDF documentation. No shipping, no waiting.


Part of the Engineers Blog Construction Programme Series. Used on GCC villa projects since 2022.

Weight 0,5 kg
Dimensions 30 × 22 × 3 cm

2 reviews for Construction Handbook for Ground+First+Roof Villa | 18-Month Cost-Loaded .xer + S-Curve

  1. Rated 5 out of 5

    Ahmed K. (verified owner)

    Excellent quality template, very professional and well-structured.

  2. Rated 5 out of 5

    Mohammed S. (verified owner)

    Great document, saved me a lot of time on my project.

Add a review

Your email address will not be published. Required fields are marked *

Construction handbook ground first roof villa - Primavera P6 .xer 18-month cost-loaded schedule with S-curve manpowerConstruction Handbook for Ground+First+Roof Villa | 18-Month Cost-Loaded .xer + S-Curve
Original price was: 32,00 $.Current price is: 12,00 $.
Scroll to Top