Sale!

Construction Handbook – 2B+GF+14 Floors Hotel Building

Rated 5.00 out of 5 based on 2 customer ratings
(3 customer reviews)

Original price was: 40,00 $.Current price is: 16,00 $.

Professional MS Project programme template for 2B+GF+14 floors+lower roof hotel building with resource loading and baseline scheduling.

Guaranteed Safe Checkout

This package includes:

  • S-Curve, Cash Flow, Manpower Histogram, and Plant & Equipment Details in professional format
  • Construction Programme / Baseline Programme in Primavera P6 .xer format
  • Work Breakdown Structure (WBS)

Project Duration: 18 Months (including 1 Month Mobilization)

Complete Hotel Construction Handbook — 2B+GF+14 Floors + Lower Roof

This comprehensive construction handbook delivers a detailed, cost-loaded Primavera P6 programme for a 2-Basement + Ground Floor + 14 Floors + Lower Roof Hotel Building. Built at Level 4 detail, it includes all activities with cost, manpower, and equipment loading — ready for baseline tracking, earned value management, and progress reporting.

High-Level WBS Overview

WBS Level Work Package Key Deliverables
1.0 Pre-Construction & Approvals LOA, Contract, NOC, Approved Drawings, Consultant Commencement Letter
2.0 Engineering Submissions & Approvals Subcontractor Pre-qual, PS/PC Nominations, Material Submittals, Shop Drawings (Arch, Structural, MEP, HVAC, ELV, FF, FA, Coordination, RCP)
3.0 Procurement & Long Lead Items Civil/MEP Long Lead, PS/PC Long Lead Items
4.0 Construction Works – Civil Substructure (2 Basements), Superstructure (GF + 14 Floors), Finishes (Internal & External)
5.0 Construction Works – MEP Power & Lighting, Home Automation/ELV, Water/Drainage, HVAC, Fire Fighting & Alarm
6.0 Completion & Handover Substantial Completion, Authority Approvals, Snagging/De-snagging, Testing & Commissioning, Client Handover

What You Get

  • 18-Month Primavera P6 .xer — Cost-loaded, resource-loaded, baseline-ready
  • S-Curve Analysis — Planned vs. Actual progress tracking
  • Cash Flow Forecast — Monthly expenditure projection
  • Manpower Histogram — Trade-wise resource allocation
  • Plant & Equipment Schedule — Equipment utilization planning
  • Critical Path Identification — Float analysis for schedule risk
  • Instant Digital Download — Google Drive link delivered immediately

Who This Is For

  • Planning Engineers & Project Controls Professionals
  • Construction Managers on High-Rise Hotel Projects
  • EPC Contractors needing baseline programmes for hospitality
  • Primavera P6 Users seeking real-world .xer templates
  • Cost Engineers building earned value baselines

Related Construction Handbooks

Handover project to the Client.

Weight 0,5 kg
Dimensions 30 × 22 × 3 cm

3 reviews for Construction Handbook – 2B+GF+14 Floors Hotel Building

  1. Rated 5 out of 5

    Ahmed K. (verified owner)

    Excellent quality template, very professional and well-structured.

  2. Rated 5 out of 5

    Mohammed S. (verified owner)

    Great document, saved me a lot of time on my project.

  3. Rated 4 out of 5

    John D. (verified owner)

    Very comprehensive and easy to customize. Highly recommended.

Add a review

Your email address will not be published. Required fields are marked *

Hotel construction handbook 2B GF 14 floors - Primavera P6 .xer 18-month cost-loaded schedule with S-curve manpowerConstruction Handbook – 2B+GF+14 Floors Hotel Building
Original price was: 40,00 $.Current price is: 16,00 $.
Scroll to Top