Date: XXX
CC/SCHINDLER/002
To : M/s XXX Intl.Ltd
Project : 2B + G + 14 + Lower Roof Hotels Building, Plot No. XXX at Al Barsha 1st, Dubai
Subject : Regarding to supply and fix RCCB type B instead of ELCB 60 A 300 ma as per DEWA load schedule and cost variance
Dear Mr. Mayur and Mr. Ramesh,
With reference to above we are hereby informing you that in our DEWA approved load schedule there is ELCB 63 A 300 ma and lift sub contractor required RCCB type B is your specific requirement and not within our scope
So, you either arrange RCCB type B or you should clear this issue with employer if your equipment have very specific demand( to be supplied by lift supplier)
Kindly, clarify this additional scope with employer as we are bound to follow the DEWA regulation only.
Regards,
For XXX Contracting L.L.C
XXX
General Manager