Date: xxx
CC/DM//1/16
To:
Head of the RTA Department
Dubai, UAE
Subject: Permission for Temporary Half Road Blocking while Concreting Loading and
Un-Loading
Dear Sir,
With reference to the above subject we are in RTA Road No 373-11th Street on Plot No
373-1297, this is ongoing construction project as per attach drawing ,kindly give the permission for half road closing while concreting hours,
Furthermore here we are undertaking that we will follow all the Rules & Regulation lead by RTA and other Local Authority as well as follow the traffic regulation, by adapting signing signal as shown in the attached drawing we will follow the same as while concreting hours.
Kindly issue the temporary half road closing permission whenever we required,
Regards,
For xxx Contracting L.L.C
Authorized Signature