Re-route your Dewatering Line

Our confirmation of your parking fees and Dewatering NOC Renewal

Date: xxx CC/AP/MG/07/16 Kind Attn:     M/s Strong Plant Project:            2B + G + 14 + Lower Roof Hotel Building Plot No.:          373-1297 at Barsha, Dubai Subject:          Our confirmation of your parking fees and Dewatering NOC Renewal Dear Sir, With reference to above mentioned subject, we would like to confirm that the parking fees […]

Our confirmation of your parking fees and Dewatering NOC Renewal Read Post »

Coordination Drawing for MEP Equipment

Provide Roof Coordination Drawing and Loading for MEP Equipment

Date: xxx CC/AP/MG/06/16 Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          373-1297 at Al Barsha 1st, Dubai Subject:           Provide Roof Coordination Drawing and Loading for MEP Equipments Dear Mr. xxx, With reference to above mentioned subject, as we discuss since many months to provide roof

Provide Roof Coordination Drawing and Loading for MEP Equipment Read Post »

Re-route your Dewatering Line

Dewatering Pit No. 1 is break down

Date: xxx CC/AP/MG/05/16 Kind Attn:     M/s. Strong Plant Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          373-1297 at Al Barsha 1st, Dubai Subject:           Dewatering Pit No. 1 is break down Dear Sir, With reference to above mentioned subject, kindly send your team to active dewatering pit no. 1 as

Dewatering Pit No. 1 is break down Read Post »

Pick-up in City Max Site Mechanical Problem (2 nos.)

Pick-up in City Max Site Mechanical Problem (2 nos.)

Date: xxx CC/AP/MG/04/16 Kind Attn:     TRANSPORT INCHARGE Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          373-1297 at Barsha, Dubai Subject:           Pick-up in City Max Site Mechanical Problem (2 nos.) Dear Sir/Ma’am, With reference to above mentioned subject,  kindly note the following: Single seat Pick Up: Alternator bearing damage and

Pick-up in City Max Site Mechanical Problem (2 nos.) Read Post »

Re-route your Dewatering Line

Re-route your Dewatering Line

Date: xxx CC/AP/MG/03/16 Kind Attn:     M/s. Strong Plant Project:            2B + G + 14+ Lower Roof Hotels Building Plot No.:          373-1297 at Barsha, Dubai Subject:           Re-route your Dewatering Line Dear Sir, With reference to above mentioned subject, all the permission was granted outside of plot limit by Drainage Department to your company and

Re-route your Dewatering Line Read Post »

Road Closing Permission

Road Closing Permission

Date: xxx CC/AP/MG/02/16 Kind Attn:     Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Subject:          Road Closing Permission Dear Sir, With reference to above mentioned subject, kindly required update or send documents to us for submission to RTA of road closing permission since

Road Closing Permission Read Post »

Dewatering

Dewatering Existing Line has to be redirected from Plot No. 373-1298

Date: xxx CC/AP/MG/01/16 To:                  M/s. Strong Plant Project:            2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Subject:          Dewatering Existing Line has to be redirected from Plot No. 373-1298 Dear Sir, With reference to above mentioned subject, kindly received the attached letter from Consultant of neighbor

Dewatering Existing Line has to be redirected from Plot No. 373-1298 Read Post »

Termination of Subcontract Agreement

Not to proceed for this project

Date: xxx CC/269/SF/01 Kind Attn:       M/s Strong Force Project:            2B + G + 14 + Lower Roof Hotel Building Plot No.:           373-1297 at Barsha, Dubai Subject:          Not to proceed for this project Dear Sir, With reference above, please do not proceed further regarding this project since there will be serious consequences with our existing contractor

Not to proceed for this project Read Post »

Contract Termination

Very serious issue may lead termination of the project or part of the project.

Date:               27.07.17 To                   : xxx Contracting Kind Attn        : Mr. xxx Project           : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Subject          :  Very serious issue may lead termination of the project or part of the project. Dear all concerned, With reference above, May face the

Very serious issue may lead termination of the project or part of the project. Read Post »

Tower Crane Support

Regarding Confirmation and No –Objection to Remove the Tower Crane Support

Date:               xxx To                   : xxx Contracting Kind Attn        : Mr. xxx Vangani /Mr. xxx Project           : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Subject          :  Regarding Confirmation and No –Objection to Remove the Tower Crane Support @ 3rd Flr. and same System and Drawing can

Regarding Confirmation and No –Objection to Remove the Tower Crane Support Read Post »