Transformer

Application no –E964644 for substation inspection and our under taking letter for Tower carne as well as logistic support to shift the transformer.

Date: xxx Ref no: CC/DEWA/003/17  To,  Mr. xxx  Head of the Inspection Department  Dewa,Dubai Project            : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Client              : Al Sheikh Faisal Bin Khalid Sultan Al Qassemi.  Subject           : Application no –E964644 for substation inspection and our under taking letter […]

Application no –E964644 for substation inspection and our under taking letter for Tower carne as well as logistic support to shift the transformer. Read Post »

Transformer

Application no –E964644 for substation inspection and our under taking letter for Tower carne as well as logistic support to shift the transformer.

Date: xxx Ref no: CC/DEWA/002/17 To,  Mr. Marwan Karani  Head of the Inspection Department  Dewa,Dubai Project            : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at  Barsha, Dubai Client              : Al Sheikh Faisal Bin Khalid Sultan Al Qassemi.  Subject         : Application no –E964644 for substation inspection and our under taking

Application no –E964644 for substation inspection and our under taking letter for Tower carne as well as logistic support to shift the transformer. Read Post »

Transformer

Our under taking letter for Tower carne removal within 70 days before transformer arrives.

Date: xxx Ref no: CC/DEWA/001/17 To                   : DEWA Project           : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai    Subject         : Our under taking letter for Tower carne removal within 70 days before transformer failure. Dear Sir, We would like to request you that our substation inspection

Our under taking letter for Tower carne removal within 70 days before transformer arrives. Read Post »

Broken Tiles

Our observation on the tile and awaited for your response

Date: xxx Ref:   CC/269/EVT/01 To:                   The Manager, Envirotec General Trading LLC Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha 1st, Dubai, and U.A.E Subject:           Our observation on the tile and awaited for your response Dear Sir, With ref. to above, as per our previous communication we

Our observation on the tile and awaited for your response Read Post »

Concreting-of-reinforced-concrete-slab-photo-by-the-author-of-the-paper

Regarding technical and chemical details of the admixture

Date: xxx Ref:   CC/269/CP/02 To:                   Al Ghurair Ready Mix Concrete Plant                         AL quoz, Dubai Project:           2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha 1st, Dubai, U.A.E Subject:          Regarding technical and chemical details of the admixture Dear Sir, With ref. to your letter AGC-R/GEN/157/16 dated 9th October,

Regarding technical and chemical details of the admixture Read Post »

Concreting-of-reinforced-concrete-slab-photo-by-the-author-of-the-paper

To propose the admixture (retarder) to delay the setting time of cement and that will not affect the properties of concrete including durability and strength

Date: xxx Ref:   CC/269/CP/02 To:                   Al Ghurair Ready Mix Concrete Plant                         AL quoz, Dubai Project:           2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha 1st, Dubai, U.A.E Subject:          To propose the admixture (retarder) to delay the setting time of cement and that will not affect the properties

To propose the admixture (retarder) to delay the setting time of cement and that will not affect the properties of concrete including durability and strength Read Post »

Testing of the anchor

Request for testing of the anchor for the above mentioned project

Date: xxx Ref:   CC/269/lab/01 To:                   Al Hothy-Stranger Laboratory Project:           2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha 1st, Dubai, U.A.E Subject:          Request for testing of the anchor for the above mentioned project Dear Sir, With ref. to the above, we are submitting here with the anchor material

Request for testing of the anchor for the above mentioned project Read Post »

Dry Mix Concrete

Request to provide confirmation of maximum time allowable to use the Drymix at the site.

Date: xxx Ref:   CC/269/qmix/01 To:                   Q.Mix Kind Attn:        The Manager Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. 373-1297 at Al Barsha 1st,        Dubai U.A.E Subject:           Request to provide confirmation of maximum time allowable to use the Drymix at the site which is our consultant – “Arkiplan Consulting Architects and

Request to provide confirmation of maximum time allowable to use the Drymix at the site. Read Post »

AAC Block

Regarding excessive wastage at site and requirement of BS code for tolerance

Date: xxx Ref:  CC/AP/269/ACICO/01  To:             M/s. xxx INDUSTRIES .Co  Kind Attn: Mr. Ahmad Ali, Mr. Suresha  Project:     2B + G + 14+ Lower Roof Hotel Building on Plot No. 373­1297 at Al Barsha 1st, Dubai U.A.E  Subject: Regarding excessive wastage at site and requirement of BS code for tolerance Dear Sir, With reference  to  the  above  and  as  intimated  earlier  by  our  purchase  team on dt.15.08.2016,we would like to inform you again that Mr. Iftakar along with QA/QC Team visited the site and we have the  following concerns: We have witnessed that there is an excessive wastage of the blocks (more than 40%) at site.  The  blocks  are  either  broken  and  the  edges  of  most  of  the  blocks  are  damaged  rendering  them  unusable. The consultant is not allowing us to use these blocks. Please note that this is not only hampering our progress at site but also causing us huge financial losses.

Regarding excessive wastage at site and requirement of BS code for tolerance Read Post »