surveyor work

Certification of Gate Level Marking

REF: No. xxx/1014/AA/2021/05 Date: xxx xxx ARCHITECTURAL & ENGINEERING CONSULTANCYOffice No. xxx, Sobha Ivory 2, Business Bay P.O. Box xxx, Dubai, UAE Project: Residential Villa (G+1) & Pump Room Block, On Plot No. xxxat Al Barari – Dubai, UAE for Mr. xxx Subject: Certification of Gate Level Marking Dear Sir, With reference to the aforementioned […]

Certification of Gate Level Marking Read Post »

Justification for Manpower in Month of April xxx

Project Team member’s introduction

REF: No. xxx/1014/AA/2021/03 Date: xxx xxx ARCHITECTURAL & ENGINEERING CONSULTANCYOffice No. xxx, Sobha Ivory 2, Business Bay P.O. Box xxx, Dubai, UAE Project: Residential Villa (G+1) & Pump Room Block, On Plot No. xxx at Al Barari – Dubai, UAE for Mr. xxx Subject: Project Team member’s introduction Dear Sir, With reference to the above

Project Team member’s introduction Read Post »

Contract Documents

Nominated Subcontractor M/S xxx Industries FZC response to the Subcontractor Agreement (Supply and Installation of Wardrobes)

Date                     : xxx Ref.                      : xxx/P1009/UHAC/2021/13 To                         : M/s. xxx Architectural Consultant P.O Box : xxx, Dubai, U.A.E Phone   : xxx, Fax : xxx Attention          : Mr. xxx – Projects Engineer Project                : Proposed Private G+1+R Villa on Plot No: xxx, At Al Barsha South First, Dubai-U.A.E. For Mr. xxx Subject              

Nominated Subcontractor M/S xxx Industries FZC response to the Subcontractor Agreement (Supply and Installation of Wardrobes) Read Post »

Undertaking Letter

Notification of delay

Date                    : XXX MCM Ref.           : XXX/P1010/AQQ/2021/01 To                         : XXX Air-Conditioning LLC. XXX, [email protected] Attention to     : Mr. XXX Project               : Proposed G+1+R Villa for Mr. XXX, Dubai. On Plot No. XXX, Al Barsha Second, Dubai. Subject               : Notification of delay Dear Mr. Ahmed, This is further to our continuous follow up since last six

Notification of delay Read Post »

CVI

Authority Violation

Date: xxx Ref.: xxx/1007/AGC/2021/44 Total Pages: 7 (photos attached) To          :              M/s. XXX Consultants P.O. Box: XXX, Dubai, UAE Phone: +XXX Attention:          Engr. Mohammed Abumeteir Project:               Proposed B+G+1 Villa for Mr. XXX, Plot No. XXX, Jumeirah First, Dubai. Subject:              DM Violation Dear Sir, This is further to the DM Violation with ref. BSXXX, below

Authority Violation Read Post »

Kalinga Stone

Submission of Commercial proposal for Wooden Cabinet

Ref.      :           XXX/1007/AGC/2021/39                                         Date: XXX To        :           M/s. XXX Consultants P.O. Box: XXX, Dubai, UAE. Phone: +XXX Fax: XXX Attention:       Mr.  XXX – Resident Engineer Project:           Proposed B+G+1 Villa for Mr. Faisal Al Gurg, Plot No. XXX, Jumeirah First, Dubai. Subject:           Submission of Commercial proposal for Wooden Cabinet Dear Sir, With reference to the

Submission of Commercial proposal for Wooden Cabinet Read Post »

calculate the variation from tender and revised drawing

Project overall progress status

P Ref.      :           XXX/1007/AGC/2021/40                                         Date: January 11, 2021 To        :           M/s. XXX Consultants P.O. Box: XXX, Dubai, UAE. Phone: +XXX Fax: +XXX Attention:       Mr.  XXX – Resident Engineer Project:           Proposed B+G+1 Villa for Mr. XXX, Plot No. XXX, Jumeirah First, Dubai. Subject:           Project overall progress status Dear Sir, With reference to aforementioned subject and

Project overall progress status Read Post »

Scroll to Top