calculate the variation from tender and revised drawing

Typical floor Drawings Submission

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject: Typical floor Drawings Submission Dear Sir, With reference to the above mentioned subject and project, we would like to inform […]

Typical floor Drawings Submission Read Post »

Lift

Regarding the Handicapped Lift at Roof near pool deck

Ref: xxx Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject:  Regarding the Handicapped Lift at Roof near pool deck. Dear Sir, With reference to the above mentioned subject. We would

Regarding the Handicapped Lift at Roof near pool deck Read Post »

Critical Path

Regarding the Lift Program delivery execution

Ref: CC/IC/SP/18/863 Date: xxx To: P.O Box: xxx Tel: xxx, Fax: xxx Project                     : 2B+G+7 Residential Building, ICP1 CBD C01, International City Client                       : M/s xxx Properties Ltd Consultant             : M/s xxx Engineering Consultant. Subject                   : Regarding the Lift Program delivery execution. Dear Sir, With reference to the above mentioned subject and project, we would

Regarding the Lift Program delivery execution Read Post »

calculate the variation from tender and revised drawing

Loading Diagram for Post Tensioning Slab

Date: xxx CC/AP/MG/26/15 To:                        M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn:           Mr. xxx Project:                2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject:               Loading Diagram for Post Tensioning Slab Dear Sir, With reference to the above mentioned subject, M/s xxx Emirates Pre-stressed

Loading Diagram for Post Tensioning Slab Read Post »

shake-up-sales-meeting

About Cash Advance Transportation Allowance

Date: xxx To:                        M/s. xxx Contracting L.L.C Dubai, UAE Kind Attn:           xxx Group HR Subject:               About Cash Advance Transportation Allowance Dear Sir/Ma’am,                With reference to the above mentioned subject, I, xxx, newly joined Civil Technical Secretary Staff in 2B + G + 14+ Lower Roof Hotels Building on Plot Noxxx at Al 

About Cash Advance Transportation Allowance Read Post »

Lift

Request to confirm the location of lift indicators Door Opening/containment for BMS System, CCTV, Access panel and Dumbwaiter structural requirement

Date :xxx Ref: CC/swb/AP/RP-300116 To, M/s. xxx Consulting Architects and Engineers Dubai, U.A.E. Attn. : Mr. xxx Project         : Proposed 2B+G+M+13 Floors Hotel Building on plot no xxx, Al Barsha 1st, Dubai Client           : Mr xxx Consultant   : M/S xxx Consulting Architects and Engineers Subject       : Request to confirm the location of lift indicators Door Opening/containment for

Request to confirm the location of lift indicators Door Opening/containment for BMS System, CCTV, Access panel and Dumbwaiter structural requirement Read Post »

PT WORKS

Replacement of PT Subcontractor Proposal instead of the approved one

Date: xxx CC/AP/MG/25/15 To:                   M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn:       Mr. xxx Project:            2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject:           Replacement of PT Subcontractor Proposal instead of the approved one Dear Sir,             With reference to the above mentioned

Replacement of PT Subcontractor Proposal instead of the approved one Read Post »

Trail Mix Concrete

Your comments for the Trial Mix test report

Date: xxx CC/CTM/ME/1/10/15 To: M/s. xxx Consulting Architects and Engineers Dubai, UAE Kind Attn:           Mr. xxx Project:               2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject:               Your comments for the Trial Mix test report dated on 27-10-15 and our submittal reference CC/AP/269/03/47A Dear Sir,               

Your comments for the Trial Mix test report Read Post »

Road Block

Permission for Temporary Half Road Blocking while Concreting Loading and offloading

Date: xxx CC/DM//1/16 To: Head of the RTA Department Dubai, UAE Subject:               Permission for Temporary Half Road Blocking while Concreting Loading and Un-Loading Dear Sir,                With reference to the above subject we are in RTA Road No 373-11th Street on Plot No 373-1297, this is ongoing construction project  as per attach drawing ,kindly

Permission for Temporary Half Road Blocking while Concreting Loading and offloading Read Post »