Regarding Non Compliance Report by reducing the architrave size and not matching with approved drawing

Date: xxx Ref no: xxx To             :M/s xxx Center Project     : 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha,  Dubai Subject    : Regarding Non Compliance Report by reducing the architrave size and not matching with approved drawing. Dear Sir, With reference to the above, we intimated to raise the inspection for the door […]

To provide clearance for the False ceiling work in guest room passage in   typical floor. (Mock up room)

Date: xxx Ref no: xxx To             :M/s xxx Center Project     : 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha,  Dubai Subject       : To provide clearance for the False ceiling work in guest room passage in   typical floor. (Mock up room) Dear Sir, With reference to the above, we are here by requesting you […]

Regarding door frame sample and our tiling work under hold issue

Date: xxx Ref no: xxx To             :M/s xxx Center Project     : 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha,  Dubai Subject     : Regarding door frame sample and our tiling work under hold issue Attention to: – MR. Dainel With reference to the above mentioned subject, as we requested guest room entrance door frame […]

Regarding collection of the documents and other concern

Date: xxx Ref no: xxx To             :M/s xxx Center Project     : 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha,  Dubai Subject     : Regarding collection of the documents and other concern Attention to: – MR.Dainel With reference to the above mentioned subject, we would like to inform the followings. Your documents received back from […]

Contract Document transmission for signature and stamp and approve of the Civil       defense door material and Dubai civil  defense license

Date: xxx Ref no: xxx To             :M/s xxx Center Project     : 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha,  Dubai Subject     : Contract Document transmission for signature and stamp and approve of the Civil       defense door material and Dubai civil  defense license Dear Sir, With reference to the above subject, we are handling […]

Your ref. HC-CM: AL BAR-CL-02 dtd. 09.05.17 and our issue

Date: xxx Ref no: xxx To             :M/s xxx Center Project     : 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha,  Dubai Subject     : Your ref. HC-CM: AL BAR-CL-02 dtd. 09.05.17 and our issue In reply of your communication contains, find our disagreement based on time-lapsed and your denial now with professional agreement/acceptance for your […]

Your shop drawing submission for joinery and doors on dated xxx

Date: xxx Ref no: xxx To             :M/s xxx Center Project     : 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha,  Dubai Subject     : Your shop drawing submission for joinery and doors on dated xxx Dear Sir, With reference to the above, regarding your transmittal form and submittal ref no.cm-al-bar-269-hc-tr001on dated 15.03.17, kindly find our […]

immediate submission of shop drawings and materials to avoid delay in partition work and coordination

Date: xxx Ref no: xxx To             :M/s xxx Center Project     : 2B + G + 14+ Lower Roof Hotels Building on Plot No. xxx at Barsha,  Dubai Subject     :Regarding immediate submission of shop drawings and materials to avoid delay in partition work and coordination Dear Sir, With reference to the above, we would like to inform you that, we are […]