Site Meeting

CONTRACTOR REVIEW FOR ENGINEERING STORE AREA THAT WILL BE CONVERTED INTO CAFETERIA IN FUTURE

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project             :2B + G + 14 + Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai U.A.E. Subject          : CONTRACTOR REVIEW FOR ENGINEERING STORE AREA THAT WILL BE CONVERTED INTO CAFETERIA IN FUTURE AND ADDITIONAL WORK REQUIREMENT IN  GARBAGE ROOM BY HPG CONSULTANT […]

CONTRACTOR REVIEW FOR ENGINEERING STORE AREA THAT WILL BE CONVERTED INTO CAFETERIA IN FUTURE Read Post »

Engineering Submittals

Regarding Document transmittal xxx issued on dated xxx and our concern for the basement and garbage room

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project             :2B + G + 14 + Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai U.A.E. Subject          : Regarding Document transmittal AP/269/32 issued on dated 06.11.16 and our  concern for the basement and garbage room Dear Sir, With reference to above ,we

Regarding Document transmittal xxx issued on dated xxx and our concern for the basement and garbage room Read Post »

Delay in the certification of our invoice

Regarding stamping required on signboard which we fixed at kerbline

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project             :2B + G + 14 + Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai U.A.E. Subject            : Regarding stamping required on signboard which we fixed at kerbline Dear Sir, With reference to the above and as per the visit of RTA

Regarding stamping required on signboard which we fixed at kerbline Read Post »

Site Meeting

Regarding submission of application of GSM room

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project             :2B + G + 14 + Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai U.A.E. Subject            : Regarding submission of application of GSM room Dear Sir, With reference to the above, we are attaching the documents received from Etisalat  with letter

Regarding submission of application of GSM room Read Post »

Rockwool panel

Regarding submission of external insulation for beam and column

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project             :2B + G + 14 + Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai U.A.E. Subject            : Regarding submission of external insulation for beam and column Dear Sir, With reference to above ,we are submitting DM circular which is in Arabic

Regarding submission of external insulation for beam and column Read Post »

Engineering Submittals

change request to delete the ceiling plaster and add the false ceiling in garbage room area at ground floor

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project             :2B + G + 14 + Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai U.A.E. Subject            : Regarding change request to delete the ceiling plaster and add the false ceiling in garbage room area at ground floor Dear Sir, With reference

change request to delete the ceiling plaster and add the false ceiling in garbage room area at ground floor Read Post »

office-checks

Mock up status report and pending item

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project             :2B + G + 14 + Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai U.A.E. Subject            : Mock up status report and pending item Dear Sir, With reference to above mentioned subject we are attaching the mock up room status of

Mock up status report and pending item Read Post »

awaiting-response

Withdrawal of Running invoice no. xxx and resubmission

Ref:                  xxx Kind Attn         :Mr. xxx Project             :2B + G + 14 + Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai U.A.E. Subject            : Withdrawal of Running invoice no.09/R1 and resubmission Dear Sir, With reference to above mentioned subject and as per the letter ref no:CC/CITYMAX-INV-09/R1 2016 Dated 28.01.17 ,as

Withdrawal of Running invoice no. xxx and resubmission Read Post »

Site Meeting

Awaited engineer’s instruction if changes required to implement/ opening at 2nd floor in OTS

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project             :2B + G + 14 + Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai U.A.E. Subject            :As per your letter ref no. xxx Dated xxx for the proposed cutouts in 14th floor -awaited engineer’s instruction if changes required to implement/ opening

Awaited engineer’s instruction if changes required to implement/ opening at 2nd floor in OTS Read Post »

The Engineers

Partition inspection report by M/s xxx and xxx engineer

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project             :2B + G + 14 + Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai U.A.E. Subject            : Partition inspection report by M/s xxx and xxx engineer Dear Sir, With reference to above mentioned subject, we are hereby attaching the inspection report

Partition inspection report by M/s xxx and xxx engineer Read Post »