Delay in the certification of our invoice

submission of proforma invoice form Aviation consultant

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject          : Regarding submission of proforma invoice form Aviation consultant RPCT R.P Canadian Trading FZE for obtaining Aviation NOC Dear Sir, With reference to the above, we are […]

submission of proforma invoice form Aviation consultant Read Post »

Incident at construction

Submission of site accident report

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject          : Regarding submission of site accident report, which happened on 10.04.17 at 13th floor due to T/C Dear Sir, With reference to the above, we are hereby

Submission of site accident report Read Post »

Substation room

submission of DEWA approved RMU and Substation room drawing

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject           : Regarding submission of DEWA approved RMU and Substation room drawing Dear Sir With reference to the above, as per minutes of meeting No. 77 page number

submission of DEWA approved RMU and Substation room drawing Read Post »

Shop Drawing

GRMS Drawing provided by client

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject      : Regarding GRMS Drawing provided by client on 19.04.17 from proposed       subcontractor (GRMS) Dear Sir With reference to the above, we recfdeived the drawing from the employer

GRMS Drawing provided by client Read Post »

Lift contract draft

confirmation from the lift contractor for the delivery of the material

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject      :    Regarding confirmation from the lift contractor for the delivery of the material                         and invoice  raised  for major equipment delivery(75% of material cost). Dear Sir With

confirmation from the lift contractor for the delivery of the material Read Post »

Letter Sample

Submission lift subcontractor letter and others requirement

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject      :    Submission lift subcontractor letter and others requirement Dear Sir With reference to the above, kindly find the following documents as you instructed in your previous mail

Submission lift subcontractor letter and others requirement Read Post »

Engineering Submittals

Request to provide clearance for Nomination of various subcontractors

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject      :    Request to provide clearance for Nomination of various subcontractors Dear Sir With reference to the above, we request you to kindly provide us the clearance for

Request to provide clearance for Nomination of various subcontractors Read Post »

False ceiling work

Regarding Nomination –Public area Fit out works

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject    : Regarding Nomination –Public area Fit out works (M/s xxx Group and                     M/s xxx Interior’s) Dear Sir, With reference to the above and your Letter Ref:

Regarding Nomination –Public area Fit out works Read Post »

MONTHLY PROGRESS REPORT

Monthly Report Template

Table of Contents PROJECT DESCRIPTION.. 2 1.1 PROJECT DETAILS. 2 1.2 PROJECT COMPONENT. 2 1.3 PROJECT DATA. 2 1.4 CONSTRUCTION PROGRAMME BRIEF. 3 PROJECT ORGANOGRAM.. 4 PROJECT STATUS. 5 3.1 KEY PARAMETERS. 5 3.2 DASH BOARD REPORT. 6 3.3 PROGRESS SUMMARY. 7 3.4 CONTRACT DURATION DETAILS IN DAYS: 8 3.5 CONTRACT DURATION DETAILS IN PERCENTAGES:

Monthly Report Template Read Post »

advance payment

Request to client to pay directly to the supplier for long lead item

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject             :  Request to client to pay directly to the supplier for long lead item or major procurement items. Dear Sir, With regards to the subject above, as

Request to client to pay directly to the supplier for long lead item Read Post »