Variation for additional column and block wall at main entrance area in Ground Floor.

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject        : Variation for additional column and block wall at main entrance area in Ground Floor. Dear Sir, With reference to above subject we would like to submit variation at entrance area in […]

NCR for roof water proofing system and approved materials

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject        : Regarding NCR for roof water proofing system and approved materials                       And re-confirmation / undertaking Dear Sir, With reference to the above mentioned subject, we are hereby stating that all […]

14th floor toilet and ablution tile

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject       : 14th floor toilet and ablution tile Dear Sir, With reference to the above, we would like to inform you that we followed continuously to provide tile for 14th floor toilet and […]

Delay in approval of Steel Structure and additional cost

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject       : Regarding the delay in approval of Steel Structure and additional cost of                       Mobile crane since we are removing the tower crane Dear Sir, With reference with the above mentioned […]

Reply – slow progress Of work and resources issue

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject       : Regarding your mail dated xxx, regarding slow progress                   Of work and resources issue Dear Sir,                With reference to your above mail (copy attached) we would like to intimate […]

Regarding Location of Central Battery Rack

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject    : Regarding Location of Central Battery Rack. Dear Sir,                With reference to above we would like to inform you that the central battery room was not designed initially in approved design […]

Taking over Service Lift and Submission of Third-Party Certificate

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject         : Taking over Service Lift and Submission of Third-Party Certificate for your record Dear Sir, Kindly find attached copy of inspection certificate issued by Elite Safety Consultants for the service lift, as […]

Undertaking letter for OTS Concrete from xxx ready mix

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject           : Undertaking letter for OTS Concrete from xxx ready mix Dear Sir, With ref. to above mentioned subject and captioned project, we are hereby undertaking for any structural consequences for strength and […]

Withdrawing the Submittal for sound attenuator

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject          : Withdrawing the Submittal for sound attenuator Dear Sir,             With reference to above subject for Submittal no.xxx Technical Submittal of Sound Attenuators. We like to withdraw this submittal as it was […]

Variation – Supply &  Installation of joinery & wooden work

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai        Subject          : Your letter ref. no. AP/269/CC/508 regarding Variation – Supply &                                   Installation of joinery & wooden work Dear Sir, Please note that nomination letter ref. no. AP/269/CC/508 dated 16/01/2018 issued […]