300mA ELCB for lift

Electrical component requirement in the lift and their quotation

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject        : Electrical component requirement in the lift and their quotation Dear Sir, With reference to above, we are hereby attaching our communication (letter ref no: xxx) with […]

Electrical component requirement in the lift and their quotation Read Post »

Tiles and other Prime Cost items

Client instruction to cut the skirting from the tile

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject        : To supply the skirting for the pool deck and client instruction to cut the skirting from the tile supplied by AQUAZONE (50×50 cm tile converting to

Client instruction to cut the skirting from the tile Read Post »

Undertaking letter

undertaking for any issue with authority for final demarcation

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject        : Confirmation to use design/approved aluminium section GL-01 (Front Elevation) as per shop drawing and undertaking for any issue with authority for final demarcation. Dear Sir, With

undertaking for any issue with authority for final demarcation Read Post »

Notification of Variation

Revised the variation for the modification work of the lift entrance door and extra cost

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject        : Regarding to revised the variation for the modification work of the lift entrance door and extra cost involve (BOQ rate for concrete, plaster and shuttering should

Revised the variation for the modification work of the lift entrance door and extra cost Read Post »

shower Glass partition

Final Confirmation for the Shower Glass Partition for Finalization of the Contract

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject        : Final Confirmation for the Shower Glass Partition for Finalization of the Contract to submit the variation for cost due to heavy duty SS section Dear Sir,

Final Confirmation for the Shower Glass Partition for Finalization of the Contract Read Post »

Notification of Variation

Handing over the variation order no: 1, 2, 3 and 4 with our signature and stamp

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject        : Handing over the variation order no: 1, 2, 3 and 4 with our signature and stamp as instructed Dear Sir, With reference to above, we are

Handing over the variation order no: 1, 2, 3 and 4 with our signature and stamp Read Post »

Substation room

Modification in electrical room located at pool deck area

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject        : Variation for Raised floor and Epoxy Coating in GSM Room at 14th Floor as required by CADDEMIRATES Subcontractor. Subject        : Modification in electrical room located at

Modification in electrical room located at pool deck area Read Post »

Notification of Variation

Variation for Raised floor and Epoxy Coating in GSM Room

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject        : Variation for Raised floor and Epoxy Coating in GSM Room at 14th Floor as required by CADDEMIRATES Subcontractor. Dear Sir, With reference to above and mail

Variation for Raised floor and Epoxy Coating in GSM Room Read Post »

Pelmet mockup

Additional length for pelmet as per site measurement

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject        : Additional length for pelmet as per site measurement and submittal for extra quantity Dear Sir, With reference to above and xxx ref no: xxx dated on

Additional length for pelmet as per site measurement Read Post »

Engineering Submittals

Submission of insurance certificate

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject        : Submission of insurance certificate Dear Sir, With reference to above we are hereby submitting insurance certificate This is for your record and to fulfill the project

Submission of insurance certificate Read Post »