Tile Installation

Floor tiling Method statement

FLOOR TILING WORKS 1.0 OBJECTIVE 1.1  To define the requirements and describe the procedure for floor tiling works for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Applicable to all toilet areas and pantry in buildings, work

Floor tiling Method statement Read Post »

Method Statement for Sub base and Gravel Base

Earthwork excavation Method statement

EARTHWORK EXCAVATION, BACKFILLING AND COMPACTION 1.0 OBJECTIVE 1.1  To define the requirement and describe the procedure for earthwork excavation, backfilling and compaction works for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Applicable to all the buildings

Earthwork excavation Method statement Read Post »

toilet door frame width

Doors Method statement

FABRICATION AND INSTALLATION OF WOODEN DOORS 1.0 OBJECTIVE 1.1 Is to define the requirements for fabrication, supply and installation of wooden doors including fire rated for the buildings under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1

Doors Method statement Read Post »

ACTIVITY HAZARD ANALYSIS Construction of Cast-in-Situ Concrete for Building structure

Concreting Method statement

CONCRETING WORKS 1.0 OBJECTIVE 1.1 Is to define the requirements for the design, supply and execution g concrete works for the constructions under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 For foundation, substructure and superstructure of

Concreting Method statement Read Post »

The Engineers Blog

Cavity wall Method statement

BLOCKWORK CAVITY WALL 1.0 OBJECTIVE 1.1 Is to define the method of construction and quality requirements of blockwork cavity walls for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Blockwork Cavity wall for the buildings in Service

Cavity wall Method statement Read Post »

Carpet flooring Method statement

Carpet flooring Method statement

CARPET FLOORING WORKS 1.0 OBJECTIVE 1.1 To define the requirements and procedure for carpet flooring works under  the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Applicable to all the office buildings at Service Base Area, Service Berth

Carpet flooring Method statement Read Post »

AAC BLOCK

Block work-Method statement

CONCRETE BLOCK WORK 1.0 OBJECTIVE 1.1 Is to define the requirements for supply and laying of concrete block work for the buildings and utilities under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Concrete block work for

Block work-Method statement Read Post »