Method Statement Title: Installation of Distribution Boards (DB’s)

1.0       Scope 1.1       This method statement details the method of installation of Distribution Boards (DBs). 2.0       Material 3.0       Applicable Location 4.0       Method 4.1       Storage   4.2       Installation 5.0       Safety 5.1       All safety precautions shall be followed as per established project safety plan and procedure. 6.0       Records             6.1       Inspection request duly signed-off by NMX and Consultant.

Method Statement Title: Installation of Isolators & Switching accessories.

1.0       Scope 1.1       This method statement details the method of installation of Isolators & Switching accessories. 2.0       Material 3.0       Applicable Location 4.0       Method 4.1       Storage   4.2       Installation 6.0       Records             6.2       Inspection request duly signed-off by NMX and Consultant.

Method Statement Title: Installation of Low Voltage Panels (LVP’s).

1.0       Scope Note : A separate Method Statement ref. ETA/MS/E-29 shall be submitted for Testing & Commissioning. 2.0       Material 3.0       Applicable Location 4.0       Method Note: L.V. Panels will be offered for factory inspection/witness by Design Consultant prior to material dispatch 4.2       Installation 6.0       Records             6.1       QC Inspection Check List. 7.0       Attachment

Method Statement Title: Installation of Generator and ATS.

1.0       Scope Note : A separate Method Statement Ref. : ETA/MS/E-039 shall be submitted for Testing & Commissioning of Generator and ATS. 2.0       Material 3.0       Applicable Location 4.0       Method 4.2.1.1 Installation Procedure: 4.2.2    ATS : 5.0       Records 6.1       Inspection Check List for Generator & ATS.

Method Statement Title: Installation of Bus Duct System.

1.0       Scope Note : A separate Method Statement ref. ETA/MS/E-32 shall be submitted for Testing & Commissioning. 2.0       Material 3.0       Applicable Location 4.0       Method 4.1       Storage   7.0       Records 8.0       Attachment 8.1       Inspection Check List for Installation of Enclosed Bus Assemblies

Method Statement Title: Installation of CCTV System

1.0       Scope This method statement details the method of installation of CCTV System.             Note             A separate Method Statement Ref. ETA/MS/E- 0   shall be submitted for testing and commissioning of the Fire Alarm System. 2.0       Material 2.3       Type of Cameras shall be as per approved shop drawing. 3.0       Applicable Location 4.0       Method 4.1       Storage   4.1.1    All materials received […]

Method Statement Title: Testing and commissioning of Door Entry System

1.0       Scope This method statement details the method of Testing and commissioning of Door Entry System.             Note 1)         A separate Method Statement Ref. ETA/MS/E- 019 shall be submitted for Installation of the CCTV System. 2)         A separate Method Statement Ref. ETA/MS/E- 020 shall be submitted for Installation of the Access Control System. 3)         A separate Method Statement Ref. ETA/MS/E- […]

Method Statement Title: Installation of Access Control System

1.0       Scope This method statement details the method of installation of Access Control System.             Note             A separate Method Statement Ref. ETA/MS/E- 038   shall be submitted for testing and commissioning of the Door Entry System (CCTV System, Access Control System, Audio Intercom, Video Intercom) 2.0       Material 2.3       Type and location of Card readers, Door contacts, Magentic locks, Exit Push […]