Method Statement Title: Installation of Fresh Air Handling Units (Floor Mounted)
Method Statement Title: Installation of Fresh Air Handling Units (Floor Mounted) 1.0 Scope 4.6 Testing 8.2 Air Handling Unit installation checklist signed off by R&P.
Engineering Letters Sample, Correspondence, Method of Statements, Submittals, Extension of Time Claim (EOT), HSE Policy, QA/QC Policy, Variation Order Request, FIDIC Red Book, Contract Agreement, Subcontractor Nomination, Provisional Sum Item, Prime Cost Items.
Method Statement Title: Installation of Fresh Air Handling Units (Floor Mounted) 1.0 Scope 4.6 Testing 8.2 Air Handling Unit installation checklist signed off by R&P.
Method Statement Title: Installation of Fans (Central Exhaust) Scope 8.2 Signified off Fan’s installation checklist.
Method Statement Title: Installation of Exhaust Fans (Parking Area) Scope 3.2 Threaded rods, fasteners for supports. 3.3 Duct flexible connections. 4.5 Electrical connections 4.5.1 Electrical power connections shall be done as per approved drawings. 4.6 BMS Interfacing BMS interfacing as defined in Material Submittal No.NMX/BDR/4045/GEN/CD/10809 dated 10.10.04 (ETA M-024, Rev.3) 8.2 Signed off Fan’s installation checklist.
Method Statement Title: Installation of Chilled Water Pumps 8.2 Pump installation check list.
Method Statement Title: Installation of Air Inlets and Outlets Towers E1, E2, E3, W1, W2, W3, Podiums and Villas. Air Inlets/Outlets – Installed on false ceiling Air Inlets/Outlets – Installed on Wall
Method Statement Title: Installation and testing of Chilled Water Piping (Pre-insulated) 1.0 Scope : 2.0 Purpose : 3.0 Material : ERW, black steel, SCH 40, Grade ‘B’ Fabricated MI fittings, grooved ends. Fabricated MS structured supports. (Sketch enclosed) 4.0 Method : Floor piping test pressure : 15 Bar Risers (Low & High) and trench piping : […]
Method Statement Title: Installation and testing of Chilled Water Piping 1.0 Scope : 2.0 Purpose : 3.0 Material : ERW, black steel, SCH 40, Grade ‘B’ Upto 50mm dia. MI fittings, Black, threaded ends 65mm dia and above – Steel Butt welding type/Grooved coupling joint type. Upto 50mm : Threaded ends 65mm and above : Flanged ends […]
Method Statement Title: Installation and testing of Chilled Water Piping (Pre-insulated) 1.0 Scope : 2.0 Purpose : 3.0 Material : ERW, black steel, SCH 40, Grade ‘B’ Fabricated MI fittings, grooved ends. Fabricated MS structured supports. (Sketch enclosed) 4.0 Method : Floor piping test pressure : 15 Bar Risers (Low & High) and trench piping : […]
METHOD STATEMENT To INSTALL BRANCH TO PRE-INSULATED DUCTWORK The following list is the considered methodology to install branch to a section of pre-insulated ductwork.
Method Statement Title: Installation of Fan Coil Units 1.0 Scope 2.0 Purpose 2.1 Purpose of this method statement is to outline the method of storage, handling and installation of fan coil units, valve package and controls. 3.0 Materal 4.0 Method 4.1 Receiving 4.2 Storage 4.2.1 While unloading, the FCUs shall be carefully and slowly lowered to the […]