Method Statement Title: Installation & Testing of Above Ground Drainage Piping

Method Statement Title: Installation & Testing of Above Ground Drainage Piping 1.0       Scope : Note  :  For the installation & testing of Above ground drainage piping concealed in columns & shear walls, refer to method statement Ref: ETA/BDR/TW1/CD/0095. 2.0       Material : b)   For 3” dia & above              –           Push fit jointing.  3.0       Applicable locations : […]

Method Statement Title: Chlorination, Disinfection and Commissioning of Domestic Water System

Method Statement Title: Chlorination, Disinfection and Commissioning of Domestic Water System 1.0     Scope :             To describe the method of flushing, Disinfecting and chlorination of domestic water System as per specification Section 15400 Clause 3.07. 2.0     Material : 3.0     Applicable locations and Description : 4.0     Method :  Refer enclosed details.

Method Statement Title: Welding Procedure

Method Statement Title: Welding Procedure 1.0       Purpose To define the Method of Welding Pipe Lines. 2.0       Scope The Method is applicable to all Chilled Water Pipe work using mild steel and carbon steel pipes and fittings, for pipe sizes 65mm dia and above in accordance with Specification Section 15050, Clause 3.04, Clause 3.07 and our material submittals reference M:002 & […]

Method Statement Title: Start-up and Commissioning of Fans

Method Statement Title: Start-up and Commissioning of Fans 1.0       Scope The scope of this Method Statement is to describe the procedure for pre-commissioning checks, start-up and commissioning of ventilation and pressurization fans installed within Burj Dubai – The Residences Project, in accordance with the Specification Section 15800.             Note a.         For installation of Fans, refer to method statement Ref. ETA/MS/M-003, […]

Method Statement Title: Start up and Commissioning of Chilled Water Pumps

Method Statement Title: Start up and Commissioning of Chilled Water Pumps 1.0       Scope The scope of this Method Statement is to define the method of Start-up and Commissioning of Tertiary Chilled Water Pumps installed in accordance with the Specification Sections 15700 & 15050.             Note a.         The testing and balancing of Chilled Water System will be covered under a separate […]

Method Statement Title: Testing, Adjusting & Balancing of HVAC System

Method Statement Title: Testing, Adjusting & Balancing of HVAC System SECTION 1 1.         GENERAL  REQUIREMENTS XXX Technologies as Independent Testing & Commissioning agency will perform the Testing, Balancing and Adjusting of the HVAC System in compliance with the specified tolerance and limitations outlined with CIBSE & BSRIA standards, guidelines and with reference to project specification. Before commencement of any test, […]

Method Statement Title: Installation of pressurization Fans

Method Statement Title: Installation of pressurization Fans 1.0       Scope 3.2       Threaded rods, fasteners for supports. 3.3       Duct flexible connections. 3.4       Electrical cables, controls and accessories. BMS interfacing shall be done as defined in Material Submittal No.NMX/BDR/4045/GEN/CD/10809 dated 10.10.04  (ETA 024, Rev.3) 8.2       Signed off Fan’s installation checklist. 9.1       Installation check list for Pressurisation Fans.

Method Statement Title: Installation of HVAC Ductwork

Method Statement Title: Installation of HVAC Ductwork 1.0       Scope : 2.0       Purpose : 4.0       Material : 5.0       Method : 5.1       Storage Preparation for the traverse joints including the fixing of the flanges/profiles as applicable as per the construction schedule is carried out at workshop. Please refer attached Annexure-II (revised) 6.0       Installation : 6.1       The layout of duct […]