Design Guidelines of Pressurized Air Compressor Rooms in Hot & Humid Climates.

MEP Design Guidelines of Pressurized Air Compressor Rooms in Hot & Humid Climates.

The area designated for compressors, known as the compressor room, constitutes a crucial component of the compressed air system. It may be a specialized room solely for compressor use or a multifunctional space. Regardless, specific criteria should be met to optimize the compressor setup. Centralizing the compressor plant is generally recommended, as it offers diverse

MEP Design Guidelines of Pressurized Air Compressor Rooms in Hot & Humid Climates. Read Post »

3-tips-for-Fire-Pump

Method Statement for Installation of Fire Pretention System

SPRINKLER PIPING SYSTEM 1.0       Scope The  scope  of  this  method  statement  is  to  describe  the  method  of  installation  of sprinkler piping system in xxx (Project Name) – The Residences Project in accordance with the project specifications. 2.0       Material 2.1       Sprinkler pipes to ASTM A536 GR `B’ 2.2       Zone Control Valve 2.3       Test and Drain Valves

Method Statement for Installation of Fire Pretention System Read Post »

Difference between PMO and PMC

Difference between PMO and PMC

1- Project Management Office (PMO)* Definition: PMO is a centralized organizational unit that oversees and supports management of projects and programs within an enterprise.* Role:– Strategic Focus: The PMO deals with strategic tasks, aligning the program to the business strategy and organizational goals.– Governance: It ensures that projects and programs adhere to methodologies, standards, and

Difference between PMO and PMC Read Post »

Differences between the various FIDIC contract books.

Differences between the various FIDIC contract books.

Differences between the various FIDIC contract books, 1. Red Book (Conditions of Contract for Construction):– Used for construction projects where the employer carries out the design.– Places more responsibility on the contractor for executing the works according to the employer’s design.– Typically includes provisions for measurement and valuation of the works, variations, and claims. 2.

Differences between the various FIDIC contract books. Read Post »