Method Statement for Fixing Shower Head
1. Introduction:
A shower head is a vital component in any bathroom, providing a means for water delivery during bathing. Fixing a shower head involves mounting it securely and connecting it to the water supply. This method statement outlines the step-by-step procedure for fixing a shower head, including safety precautions and adherence to standard guidelines.
2. Safety Precautions:
Before commencing work, prioritize safety by following these precautions:
- Turn off the water supply to the shower area to prevent accidental water flow.
- Wear appropriate personal protective equipment (PPE), such as gloves and safety goggles, to prevent injuries.
- Use tools and equipment in accordance with manufacturer instructions and safety guidelines.
- Ensure the work area is well-ventilated to avoid exposure to harmful fumes from adhesives or sealants.
- Keep the work area clean and free from obstacles to minimize the risk of accidents or tripping hazards.
3. Tools and Materials Required:
- Shower head unit
- Adjustable wrench
- Screwdriver set
- PTFE tape
- Silicone sealant
- Spirit level
- Measuring tape
4. Procedure:
Step 1: Preparation
1.1. Turn off the water supply to the shower and open the taps to drain any remaining water from the pipes.
1.2. Clear the area around the shower and ensure there is sufficient space to work comfortably.
1.3. Remove any existing fixtures or accessories that may interfere with the installation process.
Step 2: Mounting the Shower Arm
2.1. Position the shower arm in the desired location on the wall, ensuring it protrudes adequately for the shower head.
2.2. Use a spirit level to ensure the shower arm is horizontally aligned.
2.3. Mark the fixing point on the wall using a pencil.
2.4. Drill a hole at the marked position for the mounting screw or bolt, ensuring it is the appropriate size for a secure fit.
2.5. Securely fasten the shower arm to the wall using a screw or bolt and rawl plug if necessary.
Step 3: Attaching the Shower Head
3.1. Screw the shower head onto the threaded end of the shower arm, ensuring a tight fit.
3.2. Use PTFE tape to seal the threaded connection and prevent leaks.
3.3. Adjust the angle of the shower head as needed to ensure comfortable use.
Step 4: Sealing and Finishing
4.1. Apply a bead of silicone sealant around the base of the shower arm to create a waterproof seal and prevent water from seeping into the wall.
4.2. Smooth the sealant with a damp cloth or finger to achieve a neat finish.
4.3. Wipe off any excess sealant and allow sufficient time for it to cure before turning on the water supply.
Step 5: Testing
5.1. Turn on the water supply to the shower and test the shower head for proper functionality.
5.2. Check for leaks or drips around the connections.
5.3. Test the shower head to ensure it provides adequate water pressure and coverage.
5. Compliance with Standards:
Ensure that the installation of the shower head complies with relevant industry standards and guidelines, such as:
- National Plumbing Code
- Manufacturer’s Installation Instructions
- Health and Safety Regulations
6. Conclusion:
Fixing a shower head requires attention to detail and adherence to safety standards to ensure a successful installation. By following this method statement, you can achieve a professional installation that meets functional requirements and safety guidelines. Regular maintenance and inspection are recommended to prolong the lifespan of the shower head and ensure continued performance.



