Method Statement for Fixing Shower Arm
1. Introduction:
A shower arm is a crucial component in a shower setup, providing the support and connection for the shower head. Fixing a shower arm involves mounting it securely to the wall or ceiling and connecting it to the water supply. This method statement outlines the step-by-step procedure for fixing a shower arm, including safety precautions and adherence to standard guidelines.
2. Safety Precautions:
Before starting any work, prioritize safety by following these precautions:
- Turn off the water supply to the shower area to prevent accidental water flow.
- Wear appropriate personal protective equipment (PPE), such as gloves and safety goggles, to prevent injuries.
- Use tools and equipment in accordance with manufacturer instructions and safety guidelines.
- Ensure the work area is well-ventilated to avoid exposure to harmful fumes from adhesives or sealants.
- Keep the work area clean and free from obstacles to minimize the risk of accidents or tripping hazards.
3. Tools and Materials Required:
- Shower arm
- Adjustable wrench
- Screwdriver set
- Spirit level
- Measuring tape
- Drill and drill bits (if wall mounting)
- Screws or bolts and rawl plugs (if wall mounting)
- PTFE tape
- Silicone sealant
4. Procedure:
Step 1: Preparation
1.1. Turn off the water supply to the shower area and open the taps to drain any remaining water from the pipes.
1.2. Clear the area around the shower and ensure there is sufficient space to work comfortably.
1.3. Remove any existing fixtures or accessories that may interfere with the installation process.
Step 2: Determining Installation Location
2.1. Determine the ideal location for mounting the shower arm, considering factors such as height, distance from the shower valve, and user comfort.
2.2. Use a measuring tape to mark the desired position on the wall or ceiling.
Step 3: Mounting the Shower Arm
3.1. If mounting on a wall:
3.1.1. Use a spirit level to ensure the shower arm is horizontally aligned.
3.1.2. Mark the fixing points on the wall using a pencil.
3.1.3. Drill holes at the marked positions for the mounting screws or bolts, ensuring they are the appropriate size for a secure fit.
3.1.4. Insert rawl plugs into the drilled holes to provide additional support.
3.1.5. Securely fasten the shower arm to the wall using screws or bolts.
3.2. If mounting on the ceiling:
3.2.1. Use a spirit level to ensure the shower arm is horizontally aligned.
3.2.2. Mark the fixing point on the ceiling using a pencil.
3.2.3. Drill a hole at the marked position for the mounting screw or bolt, ensuring it is the appropriate size for a secure fit.
3.2.4. Insert a rawl plug into the drilled hole to provide additional support.
3.2.5. Securely fasten the shower arm to the ceiling using a screw or bolt.
Step 4: Connecting to the Water Supply
4.1. Apply PTFE tape to the threaded end of the shower arm to create a watertight seal.
4.2. Screw the threaded end of the shower arm into the shower outlet or fitting, ensuring it is securely tightened.
4.3. Use an adjustable wrench to ensure a tight fit, taking care not to over-tighten and damage the threads.
Step 5: Sealing and Finishing
5.1. Apply a bead of silicone sealant around the base of the shower arm to create a waterproof seal and prevent water from seeping into the wall or ceiling.
5.2. Smooth the sealant with a damp cloth or finger to achieve a neat finish.
5.3. Wipe off any excess sealant and allow sufficient time for it to cure before turning on the water supply.
Step 6: Testing
6.1. Turn on the water supply to the shower and test the shower arm for proper functionality.
6.2. Check for leaks around the connections.
6.3. Test the shower arm to ensure it can support the weight of the shower head and provide adequate water flow.
5. Compliance with Standards:
Ensure that the installation of the shower arm complies with relevant industry standards and guidelines, such as:
- National Plumbing Code
- Manufacturer’s Installation Instructions
- Health and Safety Regulations
6. Conclusion:
Fixing a shower arm requires attention to detail and adherence to safety standards to ensure a successful installation. By following this method statement, you can achieve a professional installation that meets functional requirements and safety guidelines. Regular maintenance and inspection are recommended to prolong the lifespan of the shower arm and ensure continued performance.



