Method Statement for Fixing a Pedestal Wash Basin
1. Introduction:
Fixing a pedestal wash basin is a fundamental task in bathroom installations, offering a functional and visually appealing fixture for handwashing. Proper installation ensures the basin is securely mounted to the wall and pedestal, providing stability and preventing leaks. This method statement provides a detailed step-by-step guide for fixing a pedestal wash basin, including safety precautions and adherence to standard guidelines.
2. Safety Precautions:
Before beginning work, prioritize safety with these precautions:
- Clear the work area to minimize tripping hazards and ensure adequate space for installation.
- Use caution when handling heavy or bulky objects to avoid strains or injuries.
- Wear appropriate personal protective equipment (PPE) such as gloves and safety goggles.
- Ensure the basin is securely installed to prevent accidents or injuries.
3. Tools and Materials Required:
- Pedestal wash basin
- Pencil
- Tape measure
- Drill
- Screwdriver or screw gun
- Wall anchors (if necessary)
- Mounting brackets or hangers (if provided)
- Adjustable wrench or spanner
- Plumbers putty or silicone sealant
- Teflon tape
- Water supply lines
- Drainage pipes and fittings
4. Procedure:
Step 1: Planning and Preparation
1.1. Choose the suitable location for the pedestal wash basin in the bathroom, considering factors such as accessibility and proximity to water supply and drainage lines.
1.2. Ensure the wall and floor where the pedestal will be placed are capable of supporting the weight of the basin and pedestal.
Step 2: Measuring and Marking
2.1. Use a tape measure to determine the exact position for the pedestal wash basin on the wall and floor.
2.2. Mark the location for drilling holes in the wall for mounting brackets or hangers, as well as for the pedestal.
Step 3: Mounting Brackets or Hangers (if applicable)
3.1. If the basin comes with mounting brackets or hangers, attach them to the wall according to the manufacturer’s instructions.
3.2. Ensure the brackets or hangers are level and securely fixed to the wall.
Step 4: Installing Water Supply Lines and Drainage Pipes
4.1. Connect the hot and cold water supply lines to the appropriate valves using Teflon tape to seal the threaded connections.
4.2. Connect the drainage pipe to the waste outlet on the basin, ensuring a secure and watertight connection.
4.3. Test the connections for leaks by turning on the water supply and checking for any drips or leaks.
Step 5: Attaching the Pedestal Wash Basin
5.1. Place the pedestal against the wall and align it with the mounting brackets or hangers.
5.2. Mark the location on the floor where the pedestal will sit.
5.3. Lift the basin onto the pedestal and align it with the mounting brackets or hangers on the wall.
5.4. Ensure the basin is level and properly aligned before securing it to the wall.
Step 6: Securing the Pedestal
6.1. Drill holes in the floor for securing the pedestal, if necessary.
6.2. Insert wall anchors into the holes and place the pedestal over them.
6.3. Secure the pedestal to the floor using screws or bolts, ensuring it is stable and level.
Step 7: Sealing and Finishing
7.1. Apply plumbers putty or silicone sealant around the edges of the basin where it meets the pedestal and wall to create a waterproof seal.
7.2. Wipe away any excess sealant and ensure the area around the basin is clean and dry.
Step 8: Testing
8.1. Test the functionality of the basin by running water and checking for any leaks or drips.
8.2. Test the stability of the basin by applying gentle pressure to ensure it is securely attached to the wall and pedestal.
Step 9: Compliance with Standards:
Ensure that the installation of the pedestal wash basin complies with relevant industry standards and guidelines, such as:
- Manufacturer’s Installation Instructions
- National Plumbing Code
- Local Building Codes and Regulations
Step 10: Conclusion:
Fixing a pedestal wash basin requires careful planning, installation, and testing to ensure proper functionality and safety. By following this method statement, you can achieve a professional installation that meets functional requirements and safety guidelines. Regular inspection and maintenance are recommended to ensure the basin remains securely attached and leak-free.



