Method Statement for Fixing Ablution Spray Mixers
1. Introduction:
Ablution spray mixers, also known as bidet sprayers or hand-held bidet sprayers, are fixtures commonly used for personal hygiene in bathrooms. Fixing ablution spray mixers involves installing the spray unit and connecting it to the water supply. This method statement provides a detailed step-by-step guide for the installation process, including safety precautions and adherence to standard guidelines.
2. Safety Precautions:
Before beginning the installation, prioritize safety by following these precautions:
- Ensure the water supply to the area is turned off to prevent accidental water flow.
- Wear appropriate personal protective equipment (PPE), such as gloves and safety goggles, to prevent injuries.
- Use tools and equipment in accordance with manufacturer instructions and safety guidelines.
- Work in a well-ventilated area to avoid exposure to harmful fumes from adhesives or sealants.
- Keep the work area clean and free from obstacles to minimize the risk of accidents or tripping hazards.
3. Tools and Materials Required:
- Ablution spray mixer unit
- Adjustable wrench
- Screwdriver set
- Pipe wrench
- PTFE tape
- Silicone sealant
- Spirit level
- Measuring tape
4. Procedure:
Step 1: Preparation
1.1. Turn off the water supply to the area where the ablution spray mixer will be installed.
1.2. Clear the area around the toilet and ensure there is sufficient space to work comfortably.
1.3. Remove any existing fixtures or accessories that may interfere with the installation process.
Step 2: Mounting the Spray Unit
2.1. Position the ablution spray mixer unit next to the toilet bowl within easy reach.
2.2. Use a spirit level to ensure the unit is horizontally aligned.
2.3. Mark the location for the mounting bracket or holder on the wall adjacent to the toilet.
2.4. Drill holes at the marked positions for the mounting screws or bolts, ensuring they are the appropriate size for a secure fit.
2.5. Securely fasten the mounting bracket or holder to the wall using screws or bolts and rawl plugs if necessary.
Step 3: Connecting Water Supply Pipes
3.1. Connect the flexible hose or pipe from the water supply to the inlet port of the ablution spray mixer unit.
3.2. Ensure the connection is tight and secure using an adjustable wrench or pipe wrench.
3.3. Apply PTFE tape to the threaded end of the pipe to create a watertight seal and prevent leaks.
Step 4: Sealing and Finishing
4.1. Apply a bead of silicone sealant around the base of the mounting bracket or holder to create a waterproof seal and prevent water from seeping into the wall.
4.2. Smooth the sealant with a damp cloth or finger to achieve a neat finish.
4.3. Wipe off any excess sealant and allow sufficient time for it to cure before turning on the water supply.
Step 5: Testing
5.1. Turn on the water supply to the ablution spray mixer and test for proper functionality.
5.2. Check for leaks or drips around the connections.
5.3. Test the spray unit to ensure it operates smoothly and provides adequate water pressure.
5. Compliance with Standards:
Ensure that the installation of the ablution spray mixer complies with relevant industry standards and guidelines, such as:
- National Plumbing Code
- Manufacturer’s Installation Instructions
- Health and Safety Regulations
6. Conclusion:
Fixing ablution spray mixers requires attention to detail and adherence to safety standards to ensure a successful installation. By following this method statement, you can achieve a professional installation that meets functional requirements and safety guidelines. Regular maintenance and inspection are recommended to prolong the lifespan of the ablution spray mixer and ensure continued performance.



