METHOD STATEMENT WATER SUPPLY WORK

METHOD STATEMENT FOR (PPR) Water Supply System

METHOD STATEMENT FOR (PPR) Water Supply System

CONTENTS

CONTENTS………………………………………………………………………………………………………….

1.0       Scope……………………………………………………………………………………………………. 3

2.0      REFERENCES…………………………………………………………………………………………………………………………………………………………..3.

3.0       Responsibilities………………………………………………………………………………… 3

4.0       SEQUENCING………………………………………………………………………………………….. 3

5.0       CONSTRUCTION PROCEDURES……………………………………………………………… 4

6.0       TESTING………………………………………………………………………………………………… 5

7.0      EQUPMENT.………………………………………………………………………………………………………………………………………5

8.0       Materials……………………………………………………………………………………………. 5

9.0       Environmental Considerations…………………………………………………… 6

10.0    Attachments……………………………………………………………………………………… 6

Attachment 1: Key to Safety Symbols…………………………………………………………………………….. 7

This method statement describe the specific safe working method which will be use by Orasccom to carry out the Draining Piping System , it gives details of how the work will be carried out , what health and safety issues and controls are involved.

Project contract no.  : Marassi project pkg # 75 & 76

Specifications            : Technical specification Section 02510 & Section 221116.

  • Construction Manager:
    • Assigning tasks of responsibilities to senior site engineers.
    • Monitoring adherence to project schedule.
    • Expeding areas of concern to best achive project schedule.
  • Senior Site Engineer:
    • Assigning areas of responsibilities to site engineers.
  • Site Engineers:                      
    • Assigning areas of responsibilities to foreman.
    • Continuous montoring of all aspects , and follow activates and co-ordinate with another activities due to any Damage of another works.
    • Inspection of  any installed Drainig pipes and fittings.
    • Liasing  with QC Engineers regarding works progression and availabilty for hold point inspections.
  • Mechanical Quality Control Engineers:
    • Ongoing inspection of all aspects of  the installation works.
    • Informaing consultant by works inspection request as and when his presence is required to carry out inspections.
    • Follow the inspected works which approved by the consultant to prevent any damage and reported it by internal site instruction .
  • Sequencing.
    • Shop drawings approval.
    • Material approval .
    • Installation of pipes with its fittings .
    • Testing according to the project specifications .
  • :

5.1 Installation preparation

  1. .

5.2 jointing of (PP-R) pipes and fittings :

  • Testing
  • Backfill along the pipe except above the pipe joints and fitting untill we proceed with the pipe test.
  • Test of the pipe according to the project specification section 02510 Division 3.5
  • Subject systems to water pressure test to prove tigtness and to flow test to prove freedom from obstruction.
  • Close all opening with plugs and fill system to point of overflow at highest opening.
  • Vent all air and ensure that water reaches all parts of system to be tested.
  •  All close sections to be tested Hydrostatic pressure Test at least 15 minutes .
  • Inspect all joints and pipes whilst under pressure and correct leaks or detective joints by replacing with new joints and materials .
  • Use callibrate pressure gage for test to prove test pressure and continue use it at all test time.
  • Repeat test after corrections are made and until systems are proven tight. 
  • Welding Device and tools .
  • Plumber tool box.
  • Personal tools.

Cosmoplast (PP-R) pipes and fitting. Transmittal No : PKG # 75&76- MT- PL-044 – Rev.01

  • Considerations

               All as per OCI procedures:

  • HSEP 01 – Evaluation of Environmental Aspects
  • HSEP 02 – Environmental Programme