CHECKLIST FOR SMOKE MANAGEMENT SYSTEM – PRE-COMMISSIONING AND COMMISSIONING

Method Statement Title: Installation of Exhaust Fans (Parking Area)

Method Statement Title: Installation of Exhaust Fans (Parking Area) Scope 3.2       Threaded rods, fasteners for supports. 3.3       Duct flexible connections. 4.5       Electrical connections 4.5.1     Electrical power connections shall be done as per approved drawings. 4.6       BMS Interfacing BMS interfacing as defined in Material Submittal No.NMX/BDR/4045/GEN/CD/10809 dated 10.10.04 (ETA M-024, Rev.3) 8.2       Signed off Fan’s installation

Method Statement Title: Installation of Exhaust Fans (Parking Area) Read Post »

WATER DISTRIBUTION SYSTEM INSTALLATION CHECK LIST

Method Statement Title: Installation and testing of Chilled Water Piping (Pre-insulated)

Method Statement Title: Installation and testing of Chilled Water Piping (Pre-insulated) 1.0       Scope : 2.0       Purpose : 3.0       Material : ERW, black steel, SCH 40, Grade ‘B’  Fabricated MI fittings, grooved ends.   Fabricated MS structured supports. (Sketch enclosed) 4.0       Method : Floor piping test pressure : 15 Bar Risers (Low &

Method Statement Title: Installation and testing of Chilled Water Piping (Pre-insulated) Read Post »

WATER DISTRIBUTION SYSTEM INSTALLATION CHECK LIST

Method Statement Title: Installation and testing of Chilled Water Piping

Method Statement Title: Installation and testing of Chilled Water Piping 1.0       Scope : 2.0       Purpose : 3.0       Material : ERW, black steel, SCH 40, Grade ‘B’  Upto 50mm dia. MI fittings, Black, threaded ends 65mm dia and above – Steel Butt welding type/Grooved coupling joint type.    Upto 50mm                 :           Threaded ends 65mm

Method Statement Title: Installation and testing of Chilled Water Piping Read Post »

Method Statement for Installation, Insulation Testing of Condensate Drain Pipework

Method Statement Title: Installation and testing of Chilled Water Piping (Pre-insulated)

Method Statement Title: Installation and testing of Chilled Water Piping (Pre-insulated) 1.0       Scope : 2.0       Purpose : 3.0       Material : ERW, black steel, SCH 40, Grade ‘B’  Fabricated MI fittings, grooved ends.   Fabricated MS structured supports. (Sketch enclosed) 4.0       Method : Floor piping test pressure : 15 Bar Risers (Low &

Method Statement Title: Installation and testing of Chilled Water Piping (Pre-insulated) Read Post »

Method Statement for Installation, Insulation Testing of Condensate Drain Pipework

Method Statement Title: Installation of Fan Coil Units

Method Statement Title: Installation of Fan Coil Units 1.0       Scope 2.0       Purpose 2.1       Purpose of this method statement is to outline the method of storage, handling and installation of fan coil units, valve package and controls.  3.0       Materal 4.0       Method 4.1       Receiving               4.2       Storage                         4.2.1    While unloading, the FCUs shall be carefully

Method Statement Title: Installation of Fan Coil Units Read Post »