CHECKLIST FOR INSTALLATION OF WATER BOOSTER PUMPS

Method Statement Title: Installation & Testing of Domestic Water Piping System

Method Statement Title: Installation & Testing of Domestic Water Piping System 1.0       Scope The scope of this method statement is to detail the method of installation and hydrostatic pressure testing of Domestic Water Piping System.             Note             The chlorination and disinfections of the system shall be covered under a separate method statement Ref. ETA/MS/P-016. […]

Method Statement Title: Installation & Testing of Domestic Water Piping System Read Post »

uPVC High Pressure Water Supply Piping System Installation Procedure

Method Statement Title: Installation & Testing of Above Ground Drainage Piping

Method Statement Title: Installation & Testing of Above Ground Drainage Piping 1.0       Scope : Note  :  For the installation & testing of Above ground drainage piping concealed in columns & shear walls, refer to method statement Ref: ETA/BDR/TW1/CD/0095. 2.0       Material : b)   For 3” dia & above              –           Push fit jointing. 

Method Statement Title: Installation & Testing of Above Ground Drainage Piping Read Post »

Butterfly Valve Installation and Maintenance Procedure

Method Statement Title: Chlorination, Disinfection and Commissioning of Domestic Water System

Method Statement Title: Chlorination, Disinfection and Commissioning of Domestic Water System 1.0     Scope :             To describe the method of flushing, Disinfecting and chlorination of domestic water System as per specification Section 15400 Clause 3.07. 2.0     Material : 3.0     Applicable locations and Description : 4.0     Method :  Refer enclosed details.

Method Statement Title: Chlorination, Disinfection and Commissioning of Domestic Water System Read Post »

CHECKLIST FOR SMOKE MANAGEMENT SYSTEM – PRE-COMMISSIONING AND COMMISSIONING

Method Statement Title: Start-up and Commissioning of Fans

Method Statement Title: Start-up and Commissioning of Fans 1.0       Scope The scope of this Method Statement is to describe the procedure for pre-commissioning checks, start-up and commissioning of ventilation and pressurization fans installed within Burj Dubai – The Residences Project, in accordance with the Specification Section 15800.             Note a.         For installation of Fans, refer

Method Statement Title: Start-up and Commissioning of Fans Read Post »

WATER DISTRIBUTION SYSTEM INSTALLATION CHECK LIST

Method Statement Title: Start up and Commissioning of Chilled Water Pumps

Method Statement Title: Start up and Commissioning of Chilled Water Pumps 1.0       Scope The scope of this Method Statement is to define the method of Start-up and Commissioning of Tertiary Chilled Water Pumps installed in accordance with the Specification Sections 15700 & 15050.             Note a.         The testing and balancing of Chilled Water System will

Method Statement Title: Start up and Commissioning of Chilled Water Pumps Read Post »

AIR DISTRIBUTION SYSTEM CHECK LIST

Method Statement Title: Testing, Adjusting & Balancing of HVAC System

Method Statement Title: Testing, Adjusting & Balancing of HVAC System SECTION 1 1.         GENERAL  REQUIREMENTS XXX Technologies as Independent Testing & Commissioning agency will perform the Testing, Balancing and Adjusting of the HVAC System in compliance with the specified tolerance and limitations outlined with CIBSE & BSRIA standards, guidelines and with reference to project specification.

Method Statement Title: Testing, Adjusting & Balancing of HVAC System Read Post »

CHECKLIST FOR SMOKE MANAGEMENT SYSTEM – PRE-COMMISSIONING AND COMMISSIONING

Method Statement Title: Installation of pressurization Fans

Method Statement Title: Installation of pressurization Fans 1.0       Scope 3.2       Threaded rods, fasteners for supports. 3.3       Duct flexible connections. 3.4       Electrical cables, controls and accessories. BMS interfacing shall be done as defined in Material Submittal No.NMX/BDR/4045/GEN/CD/10809 dated 10.10.04  (ETA 024, Rev.3) 8.2       Signed off Fan’s installation checklist. 9.1       Installation check list for Pressurisation Fans.

Method Statement Title: Installation of pressurization Fans Read Post »

Method Statement ffor HVAC Ductwork Insulation and Acoustic Lining

Method Statement Title: Installation of HVAC Ductwork

Method Statement Title: Installation of HVAC Ductwork 1.0       Scope : 2.0       Purpose : 4.0       Material : 5.0       Method : 5.1       Storage Preparation for the traverse joints including the fixing of the flanges/profiles as applicable as per the construction schedule is carried out at workshop. Please refer attached Annexure-II (revised) 6.0       Installation :