METHOD STATEMENT FOR THE JACK PROPPING SUPPORT AT BASEMENT 1 SLAB

JACK PROPPING

Purpose of WorkThis work procedure describes the method to be adopted for Jack Propping Support at Basement 1 Slab as shown in thedrawings and as directed by the engineer in charge. Equipment’s Required U – Jack Vertical Slab Base Plate Man Power DeploymentsStaff Details: Project manager Project Engineer Q/A –Q/C Safety Officer ForemanLabour Details: Shuttering… Continue reading METHOD STATEMENT FOR THE JACK PROPPING SUPPORT AT BASEMENT 1 SLAB

METHOD STATEMENT FOR THE CONCRETING at RAMP SLAB

Concreting-of-reinforced-concrete-slab-photo-by-the-author-of-the-paper

Purpose of WorkThis work procedure describes the method to be adopted for Concreting Work at Ramp Slab as shown in the drawings and as directed by the engineer in charge. Reference Contract Specification.o C45/20 OPC (210kg)+50% GGBS(210kg) Applicable drawings.o DM Approved drawing Equipment’s Required Concrete Placer Pump with 42m arm length – 1 no. working… Continue reading METHOD STATEMENT FOR THE CONCRETING at RAMP SLAB

METHOD STATEMENT FOR THE CONCRETING of SLAB at BASEMENT 1

Concreting-of-reinforced-concrete-slab-photo-by-the-author-of-the-paper

Purpose of WorkThis work procedure describes the method to be adopted for Basement 1 Slab Concreting Work as shown in the drawings and as directed by the engineer in charge. Reference Contract Specification.o C40/20 OPC (120kg)+70% GGBS(280KG) Applicable drawings.o DM Approved drawing Equipment’s Required Concrete Placer Pump with 42m arm length – 2 noS. working… Continue reading METHOD STATEMENT FOR THE CONCRETING of SLAB at BASEMENT 1

METHOD STATEMENT FOR RAMP SLAB FORMWORK AT STARTING POINT

Slab-Formwork

Purpose of work: It describes the methodology for the execution work for the Ramp Slab Formwork from Starting PointEXECUTION Surveyor has given marking for the proper measurement for the Ramp Level and Length. The slope started towards maximum 40 cm. ht. from SSL. After casting the slope area from 0.00 level to 40cm ht., we… Continue reading METHOD STATEMENT FOR RAMP SLAB FORMWORK AT STARTING POINT

METHOD STATEMENT FOR REPAIRING OF BULGED AREA at RETAINING WALL

Method-Statement-for-Concrete-Repairing

Purpose of work: It describes the methodology for the execution / treatment for the Bulged Surface Area at Retaining Wall ( Ret. 3A)Reference: Project Specification Approved DrawingEXECUTIONA. Surface Preparation Surveyor give mark for the proper measurement of Retaining Wall thickness. Chipping/ Cutting / Grinding of Mark Excess Concrete will be removed to attain the proper… Continue reading METHOD STATEMENT FOR REPAIRING OF BULGED AREA at RETAINING WALL

METHOD STATEMENT FOR CONCRETE REPAIR AT RETAINING WALL using SPECTITE Swellseal Bentobar

Method-Statement-for-Concrete-Repairing

Purpose of work: It describes the methodology for the execution for Concrete Repair at Retaining Wall with PVC Water Stopper using SPECTITE Swellseal Bentobar.EXECUTION FOR CONCRETE REPAIRING WORKA. Surface Preparation All loose materials to be removed from the surface, clean and uncontaminated. Fully clean the concrete and remove any loose or flaking concrete. Oil and… Continue reading METHOD STATEMENT FOR CONCRETE REPAIR AT RETAINING WALL using SPECTITE Swellseal Bentobar

METHOD STATEMENT FOR UN-EVEN SURFACE AT RETAINING WALL VERTICAL CONSTRUCTION JOINT

Construction Joint

Purpose of work: It describes the methodology for the execution for the un-even surface at Retaining Wall Vertical Joint. EXECUTION FOR SURFACE PREPARATIONAll loose materials should be removed from the surface by manually chipping of excess concrete until it reached the minimum thickness and by gradual mechanical abrading until it achieved and reached the same… Continue reading METHOD STATEMENT FOR UN-EVEN SURFACE AT RETAINING WALL VERTICAL CONSTRUCTION JOINT

METHOD STATEMENT FOR GYPSUM CEILING WORK

False Ceiling

              CONTENTS     SCOPE OF WORK     SUBMITTALS     SITE INSTALLATION WORKS     FRAME WORK INSPECTION, MEP CLEARNCE & CLOSURE   FINISHING GYPSUM BOARD ASSEMBLIES   FINAL CHECK UP AND HANDING OVER     SNAGGING / DESNAGGING   SCOPE OF WORK Supply and installation of Gypsum ceiling all in accordance… Continue reading METHOD STATEMENT FOR GYPSUM CEILING WORK

PLASTER WORK METHOD OF STATEMENT

CONTENTS PURPOSE SCOPE REFERENCES DEFINITIONS RESPONSIBILITIES MATERIALS & EQUIPMENT PROCEDURE PURPOSE: The purpose of this method statement is to define the procedure for internal and external plaster work in accordance with the requirement specified in the relevant specification procedures and drawing throughout the progress of the work SCOPE: This method statement applies to the application… Continue reading PLASTER WORK METHOD OF STATEMENT

BLOCK WORK METHOD OF STATEMENT

TABLE OF CONTENTS 1.           PURPOSE. 2 2.           SCOPE. 2 3.           DEFINITIONS. 2 4.           REFERENCE DOCUMENTS. 2 5.           DUTIES AND RESPONSIBILITIES. 3 6.           RESOURCES. 3 6.1.       Human Resource.. 3 6.3.       Material 4 7.2.       Sequence of Construction. 5 10.1…. Risk Assessment Analysis 7   1.           PURPOSE The purpose of this Work Method Statement for Block Works (Concrete… Continue reading BLOCK WORK METHOD OF STATEMENT