METHOD OF STATEMENT FOR REPLACING OF OLD CABLE & INSTALLING NEW CABLES

METHOD OF STATEMENT FOR REPLACING OF OLD CABLE & INSTALLING NEW CABLES

1.0       SCOPE OF WORK

This Method Statement is applicable for Replacing of old fire cable & installing new conduit.

2.0       RESPONSIBILITY

Before commencement of any installation activity, the following procedures are required to be carried out.

  • All materials used must have an approved material submittal.
    • Proceed with installation only after unsatisfactory conditions have been corrected.

3.0       DESCRIPTION OF WORK

Installation Procedure

  • Remove the old cables laying above the ceiling from detectors
  • Install the PVC pipe / pvc flexible wherever necessary
  • Install the new cable instead of old cable

4.0       LABOUR, PLANT & MATERIAL REQUIREMENTS

  • The material shall be of approved Manufacturer as per the material submittal.
    • Skilled technicians, in sufficient numbers, shall carry out the installation.
  • EQUIPMENTS REQUIRED
  • Wire cutter, Ladder, hand gloves.
  • ENVIRONMENTAL REQUIREMENTS
  • Ensure that the labour has a good working environment, a hazard free environment.
  • HEALTH & SAFETY REQUIREMENTS
  • Ensure work area is clean and tidy.

Ensure the work Area is well ventilated.