Date: 24.12.16
To,
Mr. xxx
Project : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai
Sub : Instructions for Duties
Dear Viqar,
With reference to the above, below are the planning lists of your duties for your reference.
- As per plan of R9 you should input the daily resources as per WBS
- You must visit the site and collect the data’s daily and input/record.
- You should provide monitoring and control report for individual ongoing activities.
- You should follow the tracking for approval of the subcontractor from BOQ, PSPC item.
- You should track the report with item approval and a critical.
So, as a programmer:
- Plan
- Monitor during execution
- Provide status report to control deviation.
Regards,
For xxx Contracting L.L.C
xxx
Site Engineer
xxx
Planning Engineer